| Voided | Q-0341 V2Supply and install a new diesel fire pump at Burpengary State School, 35 Station Road, Burpengary.
Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply:
INCLUSIONS:
• Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays).
• 12 Months warranty on parts and workmanship.
EXCLUSIONS:
• Routine maintenance during the warranty period.
• Upgrading of the existing electrical sub-mains to the fire pump shed distribution board.
• Work outside of Leading Fire Services normal working hours (as nominated above).
• Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered.
• Access to Energex locked rooms.
• If water isolation for repairs is not successful, additional costs will be incurred for investigation and repairs.
NOTES & CONDITIONS:
• All efforts will be made to meet the start and practical completion dates outlined in the annexure. Leading Fire Services will not be held liable for delays due to equipment delivery timeframes or site access restrictions.
• Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing.
• Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates.
• This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required.
• In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test.
We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us. | Burpengary State School | QBuild | — | 6 June 2024 | 6 July 2024 | 6 July 2024 |
| Actioned | Q-0340SITE SERVICES / PATTERN SHOP CRITICAL DEFECT RECTIFICATION - JUNE 2024
Leading Fire Services are pleased to submit for your consideration our proposal for repairs identified during the recent inspection of the fire protection equipment.
* Whilst carrying out the Annual Test on the Fire Detection systems on the Site Services / Pattern Shop Fire Panel, it was identified t6hat Zone 4 - Warehouse is in a latched alarm state and isolated. This alarm will not clear. On investigation, no smoke detector alarm LED are illuminated indicating that this is potentially due to a failed base on one of these. As these detectors are also well over 10 years old (Date of Manufacture - 2001) we have allowed in our quotation to replace all of the existing smoke detector heads and bases on this zone whilst fault finding to ensure system compliance and stability.
Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply:
INCLUSIONS:
• Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays).
EXCLUSIONS:
• Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like.
• Work outside of Leading Fire Services normal working hours (as nominated above).
• Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step.
• Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames.
• Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered.
• Access to Energex locked rooms.
• If water isolation for repairs is not successful, costs will apply for pipe freeze.
NOTES & CONDITIONS:
• The Fire and Rescue Service Act 1990 (FRSA), section 104D states that "The occupier of a building must maintain at all times every prescribed fire safety installation to a standard of safety and reliability in the event of fire”.
• Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing.
• Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote.
• Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates.
• This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required.
• The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client.
• Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs.
• In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test.
We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.
As of 1 January 2024, Leading Fire is pleased to advise that we are now utilising the full client Portal features of our Maintenance Software. This allows our clients Portal access into our Software to review the health of their sites.
These features include the following;
* Routine Maintenance Activities and due dates.
* Site Activity Reports
* Defects currently active on their sites
* Current Quotations and status of quotations.
For further information, please reach out to one of our staff members and we will be happy to provide further information regarding this. | Progress Rail Redbank | Progress Rail | — | 5 June 2024 | 5 July 2024 | 5 July 2024 |
| Actioned | Q-0339Leading Fire Services are pleased to submit for your consideration our proposal for repairs identified during the recent inspection of the fire protection equipment.
* Whilst on site conducting other works, we were advised that the Engine Rebuild / Admin Fire Panel was indicating a fault. On investigation, found that the Fire Panel had failed the automated battery load test, carried out every 4 x days. Due to this. these batteries require replacement. We have allowed for the replacement of 2 x 12-volt 33 A/H batteries in our quotation.
Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply:
INCLUSIONS:
• Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays).
EXCLUSIONS:
• Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like.
• Work outside of Leading Fire Services normal working hours (as nominated above).
• Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step.
• Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames.
• Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered.
• Access to Energex locked rooms.
• If water isolation for repairs is not successful, costs will apply for pipe freeze.
NOTES & CONDITIONS:
• The Fire and Rescue Service Act 1990 (FRSA), section 104D states that "The occupier of a building must maintain at all times every prescribed fire safety installation to a standard of safety and reliability in the event of fire”.
• Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing.
• Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote.
• Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates.
• This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required.
• The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client.
• Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs.
• In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test.
We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.
Leading Fire Services are pleased to submit for your consideration our proposal for the 12 months maintenance of the fire protection equipment. | Progress Rail Redbank | Progress Rail | — | 5 June 2024 | 5 July 2024 | 5 July 2024 |
| Actioned | Q-0338Leading Fire Services are pleased to submit for your consideration our proposal for repairs identified during the recent inspection of the fire protection equipment.
* Whilst conducting the June 2024 Monthly Fire Panel inspection, we have identified the following items that require attention;
1: Device L1D18 - Foyer Entrance is currently disabled due to unwanted alarm activations. Device requires replacement.
2: Device L1D36 Sports Hall P.W.D. Toilet detector has been removed from its location and currently resides inside the Fire Panel. Device removed due to contamination and unwanted alarm activations. Device requires replacement.
3: Device L1D94 - Kitchen Store Sounder - Device reporting a battery low fault. Backup batteries in this addressable sounder require replacement.
4: Fire Panel backup batteries are over 2 years old and require replacement. We have allowed for the replacement of the existing fire panel batteries with new in our quotation. Quoted price also includes disposal.
5: As previously mentioned, due to the constant unwanted alarm and fault conditions, we recommend that whilst carrying out the above quoted works if approved, that we also download the full site history of this system in an effort to pre-empt any potential unwanted alarm and fault conditions moving forward. From this information received, we will provide PCYC with a comprehensive report on the current state of the system, and recommendations moving forward.
Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply:
INCLUSIONS:
• Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays).
EXCLUSIONS:
• Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like.
• Work outside of Leading Fire Services normal working hours (as nominated above).
• Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step.
• Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames.
• Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered.
• Access to Energex locked rooms.
• If water isolation for repairs is not successful, costs will apply for pipe freeze.
NOTES & CONDITIONS:
• The Fire and Rescue Service Act 1990 (FRSA), section 104D states that "The occupier of a building must maintain at all times every prescribed fire safety installation to a standard of safety and reliability in the event of fire”.
• Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing.
• Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote.
• Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates.
• This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required.
• The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client.
• Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs.
• In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test.
We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.
As of 1 January 2024, Leading Fire is pleased to advise that we are now utilising the full client Portal features of our Maintenance Software. This allows our clients Portal access into our Software to review the health of their sites.
These features include the following;
* Routine Maintenance Activities and due dates.
* Site Activity Reports
* Defects currently active on their sites
* Current Quotations and status of quotations.
For further information, please reach out to one of our staff members and we will be happy to provide further information regarding this. | PCYC Bayside | QLD Police Citizens Youth Welfare Association | — | 5 June 2024 | 5 July 2024 | 5 July 2024 |
| Actioned | Q-0335Leading Fire Services are pleased to submit for your consideration our proposal for repairs identified during the recent inspection of the fire protection equipment.
* Our quotation is for the following works;
1: Replacement of all Fire Pump batteries as required.
2: Replace perished Diesel Lift Pump due to leakage
Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply:
INCLUSIONS:
• Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays).
EXCLUSIONS:
• Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like.
• Work outside of Leading Fire Services normal working hours (as nominated above).
• Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step.
• Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames.
• Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered.
• Access to Energex locked rooms.
• If water isolation for repairs is not successful, costs will apply for pipe freeze.
NOTES & CONDITIONS:
• The Fire and Rescue Service Act 1990 (FRSA), section 104D states that "The occupier of a building must maintain at all times every prescribed fire safety installation to a standard of safety and reliability in the event of fire”.
• Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing.
• Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote.
• Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates.
• This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required.
• The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client.
• Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs.
• In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test.
We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.
As of 1 January 2024, Leading Fire is pleased to advise that we are now utilising the full client Portal features of our Maintenance Software. This allows our clients Portal access into our Software to review the health of their sites.
These features include the following;
* Routine Maintenance Activities and due dates.
* Site Activity Reports
* Defects currently active on their sites
* Current Quotations and status of quotations.
For further information, please reach out to one of our staff members and we will be happy to provide further information regarding this. | Donaldson Enterprises | Donaldson Nominees | — | 3 June 2024 | 3 July 2024 | 3 July 2024 |
| Actioned | Q-0336Leading Fire Services are pleased to submit for your consideration our proposal for repairs identified during the recent inspection of the fire protection equipment.
* Whilst conducting the Annual Fire Pump Servicing, it was identified that the Electric Fire Pump Control Panel is failing. None of the Pump Statis indicator lights are functional and other issues are forcing the system to report a fault status to the Main Fire Indicator Panel.
Our quotation is for the following;
* Site attendance to replace the Failing Electric Fire Pump Control Panel.
* 100% Commissioning Test on the new Fire Pump Control Panel on Completion.
NOTE: No allowance has been made in our quotation for any upgrading of the existing Mains Powers Supply circuit to the Fire Pump Controller if required.
Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply:
INCLUSIONS:
• Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays).
EXCLUSIONS:
• Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like.
• Work outside of Leading Fire Services normal working hours (as nominated above).
• Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step.
• Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames.
• Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered.
• Access to Energex locked rooms.
• If water isolation for repairs is not successful, costs will apply for pipe freeze.
NOTES & CONDITIONS:
• The Fire and Rescue Service Act 1990 (FRSA), section 104D states that "The occupier of a building must maintain at all times every prescribed fire safety installation to a standard of safety and reliability in the event of fire”.
• Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing.
• Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote.
• Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates.
• This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required.
• The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client.
• Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs.
• In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test.
We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.
As of 1 January 2024, Leading Fire is pleased to advise that we are now utilising the full client Portal features of our Maintenance Software. This allows our clients Portal access into our Software to review the health of their sites.
These features include the following;
* Routine Maintenance Activities and due dates.
* Site Activity Reports
* Defects currently active on their sites
* Current Quotations and status of quotations.
For further information, please reach out to one of our staff members and we will be happy to provide further information regarding this. | Progress Rail Redbank | Progress Rail | — | 3 June 2024 | 3 July 2024 | 3 July 2024 |
| Actioned | Q-0337Leading Fire Services are pleased to submit for your consideration our proposal for repairs identified during the recent inspection of the fire protection equipment.
* It was identified during the recent Annual Inspections on the site's Fire Pumps that the following items are defective and require rectification. Defects are as follows;
* The Diesel Fire Pump Backup batteries are overdue for replacement.
* The Electric Fire Pump Control Battery is overdue for replacement.
* The Fire Pump Pressure switches that control the cut in pressures of the Fire Pumps are out of calibration. These require re-calibrating.
We have allowed for the above items to be rectified in our quotation.
Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply:
INCLUSIONS:
• Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays).
EXCLUSIONS:
• Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like.
• Work outside of Leading Fire Services normal working hours (as nominated above).
• Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step.
• Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames.
• Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered.
• Access to Energex locked rooms.
• If water isolation for repairs is not successful, costs will apply for pipe freeze.
NOTES & CONDITIONS:
• The Fire and Rescue Service Act 1990 (FRSA), section 104D states that "The occupier of a building must maintain at all times every prescribed fire safety installation to a standard of safety and reliability in the event of fire”.
• Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing.
• Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote.
• Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates.
• This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required.
• The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client.
• Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs.
• In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test.
We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.
As of 1 January 2024, Leading Fire is pleased to advise that we are now utilising the full client Portal features of our Maintenance Software. This allows our clients Portal access into our Software to review the health of their sites.
These features include the following;
* Routine Maintenance Activities and due dates.
* Site Activity Reports
* Defects currently active on their sites
* Current Quotations and status of quotations.
For further information, please reach out to one of our staff members and we will be happy to provide further information regarding this. | Progress Rail Redbank | Progress Rail | — | 3 June 2024 | 30 Nov 2024 | 30 Nov 2024 |
| Actioned | Q-0326Leading Fire Services are pleased to submit for your consideration our proposal for repairs identified during the recent inspection of the fire protection equipment.
* Whilst conducting routine Testing, it was identified that the external Fire Bell is no longer functional. Our quotation is to investigate the cause of this failed Bell and provide a solution to rectify.
Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply:
INCLUSIONS:
• Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays).
EXCLUSIONS:
• Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like.
• Work outside of Leading Fire Services normal working hours (as nominated above).
• Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step.
• Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames.
• Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered.
• Access to Energex locked rooms.
• If water isolation for repairs is not successful, costs will apply for pipe freeze.
NOTES & CONDITIONS:
• The Fire and Rescue Service Act 1990 (FRSA), section 104D states that "The occupier of a building must maintain at all times every prescribed fire safety installation to a standard of safety and reliability in the event of fire”.
• Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing.
• Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote.
• Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates.
• This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required.
• The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client.
• Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs.
• In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test.
We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.
As of 1 January 2024, Leading Fire is pleased to advise that we are now utilising the full client Portal features of our Maintenance Software. This allows our clients Portal access into our Software to review the health of their sites.
These features include the following;
* Routine Maintenance Activities and due dates.
* Site Activity Reports
* Defects currently active on their sites
* Current Quotations and status of quotations.
For further information, please reach out to one of our staff members and we will be happy to provide further information regarding this. | 113 Brisbane Street | Austral Meikang International Pty Ltd | — | 23 May 2024 | 22 June 2024 | 22 June 2024 |
| Voided | Q-0325Leading Fire Services are pleased to submit for your consideration our proposal for repairs identified during the recent inspection of the fire protection equipment.
* The existing Fire Indicator panel on site is subject to an "End of Life" Notice. No spare parts are available. System is slowly degrading. We strongly recommend that the site budgets for replacing this Fire Indicator Panel as soon as possible.
Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply:
INCLUSIONS:
• Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays).
EXCLUSIONS:
• Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like.
• Work outside of Leading Fire Services normal working hours (as nominated above).
• Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step.
• Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames.
• Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered.
• Access to Energex locked rooms.
• If water isolation for repairs is not successful, costs will apply for pipe freeze.
NOTES & CONDITIONS:
• The Fire and Rescue Service Act 1990 (FRSA), section 104D states that "The occupier of a building must maintain at all times every prescribed fire safety installation to a standard of safety and reliability in the event of fire”.
• Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing.
• Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote.
• Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates.
• This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required.
• The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client.
• Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs.
• In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test.
We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.
As of 1 January 2024, Leading Fire is pleased to advise that we are now utilising the full client Portal features of our Maintenance Software. This allows our clients Portal access into our Software to review the health of their sites.
These features include the following;
* Routine Maintenance Activities and due dates.
* Site Activity Reports
* Defects currently active on their sites
* Current Quotations and status of quotations.
For further information, please reach out to one of our staff members and we will be happy to provide further information regarding this. | Ellenborough House | Ellenborough House | — | 23 May 2024 | 30 Sept 2024 | 30 Sept 2024 |
| Voided | Q-0324Leading Fire Services are pleased to submit for your consideration our proposal for repairs identified during the recent inspection of the fire protection equipment.
Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply:
INCLUSIONS:
• Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays).
EXCLUSIONS:
• Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like.
• Work outside of Leading Fire Services normal working hours (as nominated above).
• Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step.
• Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames.
• Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered.
• Access to Energex locked rooms.
• If water isolation for repairs is not successful, costs will apply for pipe freeze.
NOTES & CONDITIONS:
• The Fire and Rescue Service Act 1990 (FRSA), section 104D states that "The occupier of a building must maintain at all times every prescribed fire safety installation to a standard of safety and reliability in the event of fire”.
• Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing.
• Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote.
• Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates.
• This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required.
• The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client.
• Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs.
• In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test.
We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.
As of 1 January 2024, Leading Fire is pleased to advise that we are now utilising the full client Portal features of our Maintenance Software. This allows our clients Portal access into our Software to review the health of their sites.
These features include the following;
* Routine Maintenance Activities and due dates.
* Site Activity Reports
* Defects currently active on their sites
* Current Quotations and status of quotations.
For further information, please reach out to one of our staff members and we will be happy to provide further information regarding this. | Ellenborough House | Ellenborough House | — | 23 May 2024 | 30 Sept 2024 | 30 Sept 2024 |
| Actioned | Q-0319Leading Fire Services are pleased to submit for your consideration our proposal for repairs identified during the recent inspection of the fire protection equipment.
* Please note that we have allowed for these quoted works to be done whilst conducting other works on site at PCYC Dalby. If PCYC wish for these works to be done as a one-off item, additional travel time will be incurred to rectify these defect items.
Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply:
INCLUSIONS:
• Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays).
EXCLUSIONS:
• Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like.
• Work outside of Leading Fire Services normal working hours (as nominated above).
• Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step.
• Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames.
• Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered.
• Access to Energex locked rooms.
• If water isolation for repairs is not successful, costs will apply for pipe freeze.
NOTES & CONDITIONS:
• The Fire and Rescue Service Act 1990 (FRSA), section 104D states that "The occupier of a building must maintain at all times every prescribed fire safety installation to a standard of safety and reliability in the event of fire”.
• Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing.
• Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote.
• Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates.
• This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required.
• The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client.
• Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs.
• In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test.
We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.
As of 1 January 2024, Leading Fire is pleased to advise that we are now utilising the full client Portal features of our Maintenance Software. This allows our clients Portal access into our Software to review the health of their sites.
These features include the following;
* Routine Maintenance Activities and due dates.
* Site Activity Reports
* Defects currently active on their sites
* Current Quotations and status of quotations.
For further information, please reach out to one of our staff members and we will be happy to provide further information regarding this. | PCYC Dalby | QLD Police Citizens Youth Welfare Association | — | 23 May 2024 | 22 June 2024 | 22 June 2024 |
| Actioned | Q-0323Leading Fire Services are pleased to submit for your consideration our proposal for repairs identified during the recent inspection of the fire protection equipment.
Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply:
INCLUSIONS:
• Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays).
EXCLUSIONS:
• Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like.
• Work outside of Leading Fire Services normal working hours (as nominated above).
• Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step.
• Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames.
• Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered.
• Access to Energex locked rooms.
• If water isolation for repairs is not successful, costs will apply for pipe freeze.
NOTES & CONDITIONS:
• The Fire and Rescue Service Act 1990 (FRSA), section 104D states that "The occupier of a building must maintain at all times every prescribed fire safety installation to a standard of safety and reliability in the event of fire”.
• Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing.
• Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote.
• Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates.
• This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required.
• The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client.
• Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs.
• In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test.
We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.
As of 1 January 2024, Leading Fire is pleased to advise that we are now utilising the full client Portal features of our Maintenance Software. This allows our clients Portal access into our Software to review the health of their sites.
These features include the following;
* Routine Maintenance Activities and due dates.
* Site Activity Reports
* Defects currently active on their sites
* Current Quotations and status of quotations.
For further information, please reach out to one of our staff members and we will be happy to provide further information regarding this. | 144 Brisbane Street | 144 Brisbane Street | — | 23 May 2024 | 22 June 2024 | 22 June 2024 |
| Voided | Q-0321Leading Fire Services are pleased to submit for your consideration our proposal for repairs identified during the recent inspection of the fire protection equipment.
* The below line items have been listed for information purposes only PCYC Facilities have advised that these defect items will be resolved by PCYC Maintenace staff. PCYC to provide evidence of rectification once these items have been resolved.
Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply:
INCLUSIONS:
• Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays).
EXCLUSIONS:
• Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like.
• Work outside of Leading Fire Services normal working hours (as nominated above).
• Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step.
• Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames.
• Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered.
• Access to Energex locked rooms.
• If water isolation for repairs is not successful, costs will apply for pipe freeze.
NOTES & CONDITIONS:
• The Fire and Rescue Service Act 1990 (FRSA), section 104D states that "The occupier of a building must maintain at all times every prescribed fire safety installation to a standard of safety and reliability in the event of fire”.
• Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing.
• Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote.
• Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates.
• This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required.
• The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client.
• Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs.
• In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test.
We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.
As of 1 January 2024, Leading Fire is pleased to advise that we are now utilising the full client Portal features of our Maintenance Software. This allows our clients Portal access into our Software to review the health of their sites.
These features include the following;
* Routine Maintenance Activities and due dates.
* Site Activity Reports
* Defects currently active on their sites
* Current Quotations and status of quotations.
For further information, please reach out to one of our staff members and we will be happy to provide further information regarding this. | PCYC Dalby | QLD Police Citizens Youth Welfare Association | — | 23 May 2024 | 22 June 2024 | 22 June 2024 |
| Actioned | Q-0322Leading Fire Services are pleased to submit for your consideration our proposal for repairs identified during the recent inspection of the fire protection equipment.
* As requested, this quotation is for only defect items 2061 and 2065. Please see below;
* Defect ID Number 2061 - Fire Hose Reel - Upstairs Hall: We have allowed for the replacement of the Hose Reel Nozzle and clamp in our quotation.
* Defect ID Number 2065 - Fire Extinguisher - 2.5 KG ABE Fire Extinguisher - Asset 016: Adjacent Reception: We have allowed for the replacement of this Fire Extinguisher in our quotation.
Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply:
INCLUSIONS:
• Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays).
EXCLUSIONS:
• Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like.
• Work outside of Leading Fire Services normal working hours (as nominated above).
• Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step.
• Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames.
• Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered.
• Access to Energex locked rooms.
• If water isolation for repairs is not successful, costs will apply for pipe freeze.
NOTES & CONDITIONS:
• The Fire and Rescue Service Act 1990 (FRSA), section 104D states that "The occupier of a building must maintain at all times every prescribed fire safety installation to a standard of safety and reliability in the event of fire”.
• Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing.
• Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote.
• Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates.
• This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required.
• The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client.
• Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs.
• In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test.
We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.
As of 1 January 2024, Leading Fire is pleased to advise that we are now utilising the full client Portal features of our Maintenance Software. This allows our clients Portal access into our Software to review the health of their sites.
These features include the following;
* Routine Maintenance Activities and due dates.
* Site Activity Reports
* Defects currently active on their sites
* Current Quotations and status of quotations.
For further information, please reach out to one of our staff members and we will be happy to provide further information regarding this. | PCYC Sunshine Coast | QLD Police Citizens Youth Welfare Association | — | 23 May 2024 | 22 June 2024 | 22 June 2024 |
| Actioned | Q-0320Leading Fire Services are pleased to submit for your consideration our proposal for repairs identified during the recent inspection of the fire protection equipment.
* Asset 002 - Fire Hose Reel - Foyer adjacent Rear Exit: The Stop Valve is leaking and requires replacement
* Asset 038: Fire Hose Reel - DayCare Rear Exit: The Nozzle interlock and Valve handle has been installed upside sown and is also leaking. Nozzle also spins in Hose. Valve, interlock, and nozzle require replacement.
Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply:
INCLUSIONS:
• Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays).
EXCLUSIONS:
• Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like.
• Work outside of Leading Fire Services normal working hours (as nominated above).
• Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step.
• Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames.
• Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered.
• Access to Energex locked rooms.
• If water isolation for repairs is not successful, costs will apply for pipe freeze.
NOTES & CONDITIONS:
• The Fire and Rescue Service Act 1990 (FRSA), section 104D states that "The occupier of a building must maintain at all times every prescribed fire safety installation to a standard of safety and reliability in the event of fire”.
• Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing.
• Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote.
• Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates.
• This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required.
• The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client.
• Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs.
• In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test.
We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.
As of 1 January 2024, Leading Fire is pleased to advise that we are now utilising the full client Portal features of our Maintenance Software. This allows our clients Portal access into our Software to review the health of their sites.
These features include the following;
* Routine Maintenance Activities and due dates.
* Site Activity Reports
* Defects currently active on their sites
* Current Quotations and status of quotations.
For further information, please reach out to one of our staff members and we will be happy to provide further information regarding this. | PCYC Dalby | QLD Police Citizens Youth Welfare Association | — | 23 May 2024 | 22 June 2024 | 22 June 2024 |
| Actioned | Q-0334Leading Fire Services are pleased to submit for your consideration our proposal for repairs identified during the recent inspection of the fire protection equipment.
* It was identified whilst conducting routine testing that the Fire Extinguisher for the Delivery truck is damaged, out of Pressure test Date and currently sitting on the front passenger seat floor in the drivers Cab. This Fire Extinguisher requires replacement and re-fixing to the outside of the vehicle as required. Our quotation is for the replacement of this Fire Extinguisher with new, and supply and installation of a new Heavy Duty Vehicle Bracket, to be installed on the external section at the rear or the drivers cabinet - passenger side. We have also allowed for the supply of a new U.V stabilised bag to protect this fire extinguisher from external environmental conditions.
Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply:
INCLUSIONS:
• Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays).
EXCLUSIONS:
• Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like.
• Work outside of Leading Fire Services normal working hours (as nominated above).
• Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step.
• Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames.
• Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered.
• Access to Energex locked rooms.
• If water isolation for repairs is not successful, costs will apply for pipe freeze.
NOTES & CONDITIONS:
• The Fire and Rescue Service Act 1990 (FRSA), section 104D states that "The occupier of a building must maintain at all times every prescribed fire safety installation to a standard of safety and reliability in the event of fire”.
• Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing.
• Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote.
• Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates.
• This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required.
• The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client.
• Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs.
• In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test.
We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.
As of 1 January 2024, Leading Fire is pleased to advise that we are now utilising the full client Portal features of our Maintenance Software. This allows our clients Portal access into our Software to review the health of their sites.
These features include the following;
* Routine Maintenance Activities and due dates.
* Site Activity Reports
* Defects currently active on their sites
* Current Quotations and status of quotations.
For further information, please reach out to one of our staff members and we will be happy to provide further information regarding this. | ROHR PTY LTD | Marmel Holdings Pty Ltd T/a Martogg Engineering Services | — | 23 May 2024 | 22 June 2024 | 22 June 2024 |
| Actioned | Q-0333Leading Fire Services are pleased to submit for your consideration our proposal for repairs identified during the recent inspection of the fire protection equipment.
Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply:
INCLUSIONS:
• Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays).
EXCLUSIONS:
• Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like.
• Work outside of Leading Fire Services normal working hours (as nominated above).
• Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step.
• Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames.
• Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered.
• Access to Energex locked rooms.
• If water isolation for repairs is not successful, costs will apply for pipe freeze.
NOTES & CONDITIONS:
• The Fire and Rescue Service Act 1990 (FRSA), section 104D states that "The occupier of a building must maintain at all times every prescribed fire safety installation to a standard of safety and reliability in the event of fire”.
• Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing.
• Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote.
• Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates.
• This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required.
• The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client.
• Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs.
• In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test.
We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.
As of 1 January 2024, Leading Fire is pleased to advise that we are now utilising the full client Portal features of our Maintenance Software. This allows our clients Portal access into our Software to review the health of their sites.
These features include the following;
* Routine Maintenance Activities and due dates.
* Site Activity Reports
* Defects currently active on their sites
* Current Quotations and status of quotations.
For further information, please reach out to one of our staff members and we will be happy to provide further information regarding this. | ROHR PTY LTD | Marmel Holdings Pty Ltd T/a Martogg Engineering Services | — | 23 May 2024 | 22 June 2024 | 22 June 2024 |
| Actioned | Q-0332Leading Fire Services are pleased to submit for your consideration our proposal for repairs identified during the recent inspection of the fire protection equipment.
Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply:
INCLUSIONS:
• Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays).
EXCLUSIONS:
• Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like.
• Work outside of Leading Fire Services normal working hours (as nominated above).
• Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step.
• Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames.
• Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered.
• Access to Energex locked rooms.
• If water isolation for repairs is not successful, costs will apply for pipe freeze.
NOTES & CONDITIONS:
• The Fire and Rescue Service Act 1990 (FRSA), section 104D states that "The occupier of a building must maintain at all times every prescribed fire safety installation to a standard of safety and reliability in the event of fire”.
• Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing.
• Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote.
• Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates.
• This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required.
• The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client.
• Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs.
• In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test.
We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.
Leading Fire Services are pleased to submit for your consideration our proposal for the 12 months maintenance of the fire protection equipment. | ROHR PTY LTD | Marmel Holdings Pty Ltd T/a Martogg Engineering Services | — | 23 May 2024 | 22 June 2024 | 22 June 2024 |
| Actioned | Q-0331Leading Fire Services are pleased to submit for your consideration our proposal for repairs identified during the recent inspection of the fire protection equipment.
** Whilst conducting recent testing, it was found that the following items require attention;
* Existing Fire panel backup batteries are over 2 years old and require replacement. We have allowed for the replacement of these batteries in our quotation.
* Heat Sensor - Loop 1 - Sensor 19 is reporting a "No Answer" fault and requires replacement.
* It was identified that their currently is no Evacuation system coverage for the front Administration Office. Our quotation is for the installation of 1 x new IP66 rated Horn Speaker, to be installed on the outside of the Main Warehouse and directed at the Administration Building to provide Evacuation Tone Coverage as required.
** NOTE: We have not allowed for the supply of any Elevated Work Platform Hire (E.W.P.) in our quotation as we were advised that the site will provide this. If we are to provide this, a separate quotation will be supplied for the hire of this E.W.P. for these works.
Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply:
INCLUSIONS:
• Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays).
EXCLUSIONS:
• Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like.
• Work outside of Leading Fire Services normal working hours (as nominated above).
• Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step.
• Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames.
• Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered.
• Access to Energex locked rooms.
• If water isolation for repairs is not successful, costs will apply for pipe freeze.
NOTES & CONDITIONS:
• The Fire and Rescue Service Act 1990 (FRSA), section 104D states that "The occupier of a building must maintain at all times every prescribed fire safety installation to a standard of safety and reliability in the event of fire”.
• Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing.
• Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote.
• Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates.
• This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required.
• The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client.
• Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs.
• In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test.
We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.
As of 1 January 2024, Leading Fire is pleased to advise that we are now utilising the full client Portal features of our Maintenance Software. This allows our clients Portal access into our Software to review the health of their sites.
These features include the following;
* Routine Maintenance Activities and due dates.
* Site Activity Reports
* Defects currently active on their sites
* Current Quotations and status of quotations.
For further information, please reach out to one of our staff members and we will be happy to provide further information regarding this. | ROHR PTY LTD | Marmel Holdings Pty Ltd T/a Martogg Engineering Services | — | 23 May 2024 | 22 June 2024 | 22 June 2024 |
| Actioned | Q-0330Leading Fire Services are pleased to submit for your consideration our proposal for repairs identified during the recent inspection of the fire protection equipment.
Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply:
INCLUSIONS:
• Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays).
EXCLUSIONS:
• Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like.
• Work outside of Leading Fire Services normal working hours (as nominated above).
• Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step.
• Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames.
• Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered.
• Access to Energex locked rooms.
• If water isolation for repairs is not successful, costs will apply for pipe freeze.
NOTES & CONDITIONS:
• The Fire and Rescue Service Act 1990 (FRSA), section 104D states that "The occupier of a building must maintain at all times every prescribed fire safety installation to a standard of safety and reliability in the event of fire”.
• Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing.
• Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote.
• Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates.
• This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required.
• The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client.
• Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs.
• In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test.
We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.
As of 1 January 2024, Leading Fire is pleased to advise that we are now utilising the full client Portal features of our Maintenance Software. This allows our clients Portal access into our Software to review the health of their sites.
These features include the following;
* Routine Maintenance Activities and due dates.
* Site Activity Reports
* Defects currently active on their sites
* Current Quotations and status of quotations.
For further information, please reach out to one of our staff members and we will be happy to provide further information regarding this. | ROHR PTY LTD | Marmel Holdings Pty Ltd T/a Martogg Engineering Services | — | 23 May 2024 | 22 June 2024 | 22 June 2024 |
| Deleted | Q-0329Leading Fire Services are pleased to submit for your consideration our proposal for repairs identified during the recent inspection of the fire protection equipment.
* The Fire Panel backup batteries are over 2 years old. There are also now producing a "Low Battery" fault when automated Fire Panel Battery Load test is conducted every 4 days. Our quotation is for the replacement of these failing Fire panel Batteries.
Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply:
INCLUSIONS:
• Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays).
EXCLUSIONS:
• Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like.
• Work outside of Leading Fire Services normal working hours (as nominated above).
• Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step.
• Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames.
• Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered.
• Access to Energex locked rooms.
• If water isolation for repairs is not successful, costs will apply for pipe freeze.
NOTES & CONDITIONS:
• The Fire and Rescue Service Act 1990 (FRSA), section 104D states that "The occupier of a building must maintain at all times every prescribed fire safety installation to a standard of safety and reliability in the event of fire”.
• Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing.
• Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote.
• Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates.
• This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required.
• The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client.
• Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs.
• In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test.
We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.
As of 1 January 2024, Leading Fire is pleased to advise that we are now utilising the full client Portal features of our Maintenance Software. This allows our clients Portal access into our Software to review the health of their sites.
These features include the following;
* Routine Maintenance Activities and due dates.
* Site Activity Reports
* Defects currently active on their sites
* Current Quotations and status of quotations.
For further information, please reach out to one of our staff members and we will be happy to provide further information regarding this. | Southern Queensland Steel | Southern Queensland Steel Pty Ltd | — | 23 May 2024 | 22 June 2024 | 22 June 2024 |
| Voided | Q-0328Leading Fire Services are pleased to submit for your consideration our proposal for repairs identified during the recent inspection of the fire protection equipment.
Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply:
INCLUSIONS:
• Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays).
EXCLUSIONS:
• Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like.
• Work outside of Leading Fire Services normal working hours (as nominated above).
• Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step.
• Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames.
• Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered.
• Access to Energex locked rooms.
• If water isolation for repairs is not successful, costs will apply for pipe freeze.
NOTES & CONDITIONS:
• The Fire and Rescue Service Act 1990 (FRSA), section 104D states that "The occupier of a building must maintain at all times every prescribed fire safety installation to a standard of safety and reliability in the event of fire”.
• Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing.
• Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote.
• Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates.
• This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required.
• The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client.
• Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs.
• In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test.
We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.
As of 1 January 2024, Leading Fire is pleased to advise that we are now utilising the full client Portal features of our Maintenance Software. This allows our clients Portal access into our Software to review the health of their sites.
These features include the following;
* Routine Maintenance Activities and due dates.
* Site Activity Reports
* Defects currently active on their sites
* Current Quotations and status of quotations.
For further information, please reach out to one of our staff members and we will be happy to provide further information regarding this. | Poolwerx | Poolwerx | — | 23 May 2024 | 22 June 2024 | 22 June 2024 |
| Voided | Q-0327Leading Fire Services are pleased to submit for your consideration our proposal for repairs identified during the recent inspection of the fire protection equipment.
* It was identified whilst conducting recent testing that the following items failed and require replacement.
* Asset SFS005671 - Nozzle not retained in the interlock. We have allowed to repair this Fire Hose Reel.
* Asset 15 - Exit light: This Light failed the 90-minute discharge test and requires replacement.
** Please note that these are additional defect items which have been identified. If approved, these items will be rectified at the same time with the previously quoted items.
Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply:
INCLUSIONS:
• Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays).
EXCLUSIONS:
• Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like.
• Work outside of Leading Fire Services normal working hours (as nominated above).
• Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step.
• Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames.
• Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered.
• Access to Energex locked rooms.
• If water isolation for repairs is not successful, costs will apply for pipe freeze.
NOTES & CONDITIONS:
• The Fire and Rescue Service Act 1990 (FRSA), section 104D states that "The occupier of a building must maintain at all times every prescribed fire safety installation to a standard of safety and reliability in the event of fire”.
• Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing.
• Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote.
• Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates.
• This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required.
• The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client.
• Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs.
• In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test.
We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.
As of 1 January 2024, Leading Fire is pleased to advise that we are now utilising the full client Portal features of our Maintenance Software. This allows our clients Portal access into our Software to review the health of their sites.
These features include the following;
* Routine Maintenance Activities and due dates.
* Site Activity Reports
* Defects currently active on their sites
* Current Quotations and status of quotations.
For further information, please reach out to one of our staff members and we will be happy to provide further information regarding this. | 113 Brisbane Street | Austral Meikang International Pty Ltd | — | 23 May 2024 | 22 June 2024 | 22 June 2024 |
| Voided | Q-0316Leading Fire Services are pleased to submit for your consideration our proposal for repairs identified during the recent inspection of the fire protection equipment.
* In our quotation, we have allowed for the reporting of the non-conformance defect repairs.
Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply:
INCLUSIONS:
• Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays).
EXCLUSIONS:
• Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like.
• Work outside of Leading Fire Services normal working hours (as nominated above).
• Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step.
• Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames.
• Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered.
• Access to Energex locked rooms.
• If water isolation for repairs is not successful, costs will apply for pipe freeze.
NOTES & CONDITIONS:
• The Fire and Rescue Service Act 1990 (FRSA), section 104D states that "The occupier of a building must maintain at all times every prescribed fire safety installation to a standard of safety and reliability in the event of fire”.
• Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing.
• Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote.
• Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates.
• This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required.
• The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client.
• Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs.
• In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test.
We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.
As of 1 January 2024, Leading Fire is pleased to advise that we are now utilising the full client Portal features of our Maintenance Software. This allows our clients Portal access into our Software to review the health of their sites.
These features include the following;
* Routine Maintenance Activities and due dates.
* Site Activity Reports
* Defects currently active on their sites
* Current Quotations and status of quotations.
For further information, please reach out to one of our staff members and we will be happy to provide further information regarding this. | PCYC Ipswich | QLD Police Citizens Youth Welfare Association | — | 22 May 2024 | 21 June 2024 | 21 June 2024 |
| Voided | Q-0317Leading Fire Services are pleased to submit for your consideration our proposal for repairs identified during the recent inspection of the fire protection equipment.
* The following items have been included in our quotation;
* Fuel level Indicator has seized. Our price is to replace with new.
* The Diesel Fire Pump batteries are overdue for replacement. We have allowed for the replacement of 2 x 12-volt 75 A/H batteries in our quotation.
* Pump Pressure accumulator is outside of normal tolerance. Accumulator requires replacement.
Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply:
INCLUSIONS:
• Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays).
EXCLUSIONS:
• Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like.
• Work outside of Leading Fire Services normal working hours (as nominated above).
• Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step.
• Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames.
• Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered.
• Access to Energex locked rooms.
• If water isolation for repairs is not successful, costs will apply for pipe freeze.
NOTES & CONDITIONS:
• The Fire and Rescue Service Act 1990 (FRSA), section 104D states that "The occupier of a building must maintain at all times every prescribed fire safety installation to a standard of safety and reliability in the event of fire”.
• Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing.
• Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote.
• Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates.
• This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required.
• The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client.
• Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs.
• In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test.
We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.
As of 1 January 2024, Leading Fire is pleased to advise that we are now utilising the full client Portal features of our Maintenance Software. This allows our clients Portal access into our Software to review the health of their sites.
These features include the following;
* Routine Maintenance Activities and due dates.
* Site Activity Reports
* Defects currently active on their sites
* Current Quotations and status of quotations.
For further information, please reach out to one of our staff members and we will be happy to provide further information regarding this. | PCYC Hervey Bay | QLD Police Citizens Youth Welfare Association | — | 22 May 2024 | 31 July 2024 | 31 July 2024 |
| Actioned | Q-0314Leading Fire Services are pleased to submit for your consideration our proposal for repairs identified during the recent inspection of the fire protection equipment.
* In our quotation, we have allowed to rectify the Fire Hose Reel to provide the minimum of 100 mm clearance around the handle.
Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply:
INCLUSIONS:
• Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays).
EXCLUSIONS:
• Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like.
• Work outside of Leading Fire Services normal working hours (as nominated above).
• Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step.
• Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames.
• Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered.
• Access to Energex locked rooms.
• If water isolation for repairs is not successful, costs will apply for pipe freeze.
NOTES & CONDITIONS:
• The Fire and Rescue Service Act 1990 (FRSA), section 104D states that "The occupier of a building must maintain at all times every prescribed fire safety installation to a standard of safety and reliability in the event of fire”.
• Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing.
• Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote.
• Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates.
• This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required.
• The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client.
• Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs.
• In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test.
We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.
As of 1 January 2024, Leading Fire is pleased to advise that we are now utilising the full client Portal features of our Maintenance Software. This allows our clients Portal access into our Software to review the health of their sites.
These features include the following;
* Routine Maintenance Activities and due dates.
* Site Activity Reports
* Defects currently active on their sites
* Current Quotations and status of quotations.
For further information, please reach out to one of our staff members and we will be happy to provide further information regarding this. | PCYC Ipswich | QLD Police Citizens Youth Welfare Association | — | 22 May 2024 | 21 June 2024 | 21 June 2024 |
| Deleted | Q-0315Leading Fire Services are pleased to submit for your consideration our proposal for repairs identified during the recent inspection of the fire protection equipment.
Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply:
INCLUSIONS:
• Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays).
EXCLUSIONS:
• Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like.
• Work outside of Leading Fire Services normal working hours (as nominated above).
• Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step.
• Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames.
• Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered.
• Access to Energex locked rooms.
• If water isolation for repairs is not successful, costs will apply for pipe freeze.
NOTES & CONDITIONS:
• The Fire and Rescue Service Act 1990 (FRSA), section 104D states that "The occupier of a building must maintain at all times every prescribed fire safety installation to a standard of safety and reliability in the event of fire”.
• Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing.
• Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote.
• Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates.
• This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required.
• The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client.
• Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs.
• In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test.
We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.
As of 1 January 2024, Leading Fire is pleased to advise that we are now utilising the full client Portal features of our Maintenance Software. This allows our clients Portal access into our Software to review the health of their sites.
These features include the following;
* Routine Maintenance Activities and due dates.
* Site Activity Reports
* Defects currently active on their sites
* Current Quotations and status of quotations.
For further information, please reach out to one of our staff members and we will be happy to provide further information regarding this. | PCYC Ipswich | QLD Police Citizens Youth Welfare Association | — | 22 May 2024 | 21 June 2024 | 21 June 2024 |
| Deleted | Q-0318 | PCYC Hervey Bay | QLD Police Citizens Youth Welfare Association | — | 22 May 2024 | 21 June 2024 | 21 June 2024 |
| Voided | Q-0313Leading Fire Services are pleased to submit for your consideration our proposal for repairs identified during the recent inspection of the fire protection equipment.
* Our Quotation is for the Replacement of the leaking Fire Hose Reel and interlocking ball valve.
Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply:
INCLUSIONS:
• Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays).
EXCLUSIONS:
• Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like.
• Work outside of Leading Fire Services normal working hours (as nominated above).
• Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step.
• Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames.
• Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered.
• Access to Energex locked rooms.
• If water isolation for repairs is not successful, costs will apply for pipe freeze.
NOTES & CONDITIONS:
• The Fire and Rescue Service Act 1990 (FRSA), section 104D states that "The occupier of a building must maintain at all times every prescribed fire safety installation to a standard of safety and reliability in the event of fire”.
• Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing.
• Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote.
• Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates.
• This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required.
• The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client.
• Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs.
• In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test.
We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.
As of 1 January 2024, Leading Fire is pleased to advise that we are now utilising the full client Portal features of our Maintenance Software. This allows our clients Portal access into our Software to review the health of their sites.
These features include the following;
* Routine Maintenance Activities and due dates.
* Site Activity Reports
* Defects currently active on their sites
* Current Quotations and status of quotations.
For further information, please reach out to one of our staff members and we will be happy to provide further information regarding this. | PCYC Gladstone | QLD Police Citizens Youth Welfare Association | — | 22 May 2024 | 31 Aug 2024 | 31 Aug 2024 |
| Actioned | Q-0312Leading Fire Services are pleased to submit for your consideration our proposal for repairs identified during the recent inspection of the fire protection equipment.
* The Backup Fire panel batteries in the Fire Indicator Panel are over 2 years old and require replacement.
Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply:
INCLUSIONS:
• Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays).
EXCLUSIONS:
• Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like.
• Work outside of Leading Fire Services normal working hours (as nominated above).
• Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step.
• Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames.
• Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered.
• Access to Energex locked rooms.
• If water isolation for repairs is not successful, costs will apply for pipe freeze.
NOTES & CONDITIONS:
• The Fire and Rescue Service Act 1990 (FRSA), section 104D states that "The occupier of a building must maintain at all times every prescribed fire safety installation to a standard of safety and reliability in the event of fire”.
• Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing.
• Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote.
• Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates.
• This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required.
• The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client.
• Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs.
• In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test.
We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.
As of 1 January 2024, Leading Fire is pleased to advise that we are now utilising the full client Portal features of our Maintenance Software. This allows our clients Portal access into our Software to review the health of their sites.
These features include the following;
* Routine Maintenance Activities and due dates.
* Site Activity Reports
* Defects currently active on their sites
* Current Quotations and status of quotations.
For further information, please reach out to one of our staff members and we will be happy to provide further information regarding this. | Southern Queensland Steel | Southern Queensland Steel Pty Ltd | — | 17 May 2024 | 31 July 2024 | 31 July 2024 |
| Voided | Q-0311Leading Fire Services are pleased to submit for your consideration our proposal for repairs identified during the recent inspection of the fire protection equipment.
* In our quotation, we have allowed for the installation of 2 x new Fire Evacuation Speakers to be installed in the Administration Offices behind the Fire Indicator Panel.
Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply:
INCLUSIONS:
• Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays).
EXCLUSIONS:
• Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like.
• Work outside of Leading Fire Services normal working hours (as nominated above).
• Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step.
• Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames.
• Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered.
• Access to Energex locked rooms.
• If water isolation for repairs is not successful, costs will apply for pipe freeze.
NOTES & CONDITIONS:
• The Fire and Rescue Service Act 1990 (FRSA), section 104D states that "The occupier of a building must maintain at all times every prescribed fire safety installation to a standard of safety and reliability in the event of fire”.
• Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing.
• Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote.
• Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates.
• This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required.
• The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client.
• Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs.
• In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test.
We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.
As of 1 January 2024, Leading Fire is pleased to advise that we are now utilising the full client Portal features of our Maintenance Software. This allows our clients Portal access into our Software to review the health of their sites.
These features include the following;
* Routine Maintenance Activities and due dates.
* Site Activity Reports
* Defects currently active on their sites
* Current Quotations and status of quotations.
For further information, please reach out to one of our staff members and we will be happy to provide further information regarding this. | PCYC Sandgate | QLD Police Citizens Youth Welfare Association | — | 16 May 2024 | 30 Sept 2024 | 30 Sept 2024 |
| Voided | Q-0306Leading Fire Services are pleased to submit for your consideration our proposal for repairs identified during the recent inspection of the fire protection equipment.
* The Fire Hydrant Block Plan is severely damaged due to water and environmental conditions. This Fire Hydrant Block Plan requires replacement.
Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply:
INCLUSIONS:
• Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays).
EXCLUSIONS:
• Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like.
• Work outside of Leading Fire Services normal working hours (as nominated above).
• Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step.
• Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames.
• Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered.
• Access to Energex locked rooms.
• If water isolation for repairs is not successful, costs will apply for pipe freeze.
NOTES & CONDITIONS:
• The Fire and Rescue Service Act 1990 (FRSA), section 104D states that "The occupier of a building must maintain at all times every prescribed fire safety installation to a standard of safety and reliability in the event of fire”.
• Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing.
• Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote.
• Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates.
• This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required.
• The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client.
• Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs.
• In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test.
We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.
As of 1 January 2024, Leading Fire is pleased to advise that we are now utilising the full client Portal features of our Maintenance Software. This allows our clients Portal access into our Software to review the health of their sites.
These features include the following;
* Routine Maintenance Activities and due dates.
* Site Activity Reports
* Defects currently active on their sites
* Current Quotations and status of quotations.
For further information, please reach out to one of our staff members and we will be happy to provide further information regarding this. | PCYC Hervey Bay | QLD Police Citizens Youth Welfare Association | — | 15 May 2024 | 31 July 2024 | 31 July 2024 |
| Voided | Q-0303Leading Fire Services are pleased to submit for your consideration our proposal for repairs identified during the recent inspection of the fire protection equipment.
Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply:
INCLUSIONS:
• Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays).
EXCLUSIONS:
• Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like.
• Work outside of Leading Fire Services normal working hours (as nominated above).
• Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step.
• Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames.
• Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered.
• Access to Energex locked rooms.
• If water isolation for repairs is not successful, costs will apply for pipe freeze.
NOTES & CONDITIONS:
• The Fire and Rescue Service Act 1990 (FRSA), section 104D states that "The occupier of a building must maintain at all times every prescribed fire safety installation to a standard of safety and reliability in the event of fire”.
• Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing.
• Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote.
• Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates.
• This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required.
• The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client.
• Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs.
• In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test.
We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us. | ROHR PTY LTD | Marmel Holdings Pty Ltd T/a Martogg Engineering Services | — | 15 May 2024 | 14 June 2024 | 14 June 2024 |
| Actioned | Q-0310Leading Fire Services are pleased to submit for your consideration our proposal for repairs identified during the recent inspection of the fire protection equipment.
Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply:
INCLUSIONS:
• Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays).
EXCLUSIONS:
• Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like.
• Work outside of Leading Fire Services normal working hours (as nominated above).
• Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step.
• Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames.
• Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered.
• Access to Energex locked rooms.
• If water isolation for repairs is not successful, costs will apply for pipe freeze.
NOTES & CONDITIONS:
• The Fire and Rescue Service Act 1990 (FRSA), section 104D states that "The occupier of a building must maintain at all times every prescribed fire safety installation to a standard of safety and reliability in the event of fire”.
• Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing.
• Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote.
• Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates.
• This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required.
• The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client.
• Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs.
• In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test.
We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.
As of 1 January 2024, Leading Fire is pleased to advise that we are now utilising the full client Portal features of our Maintenance Software. This allows our clients Portal access into our Software to review the health of their sites.
These features include the following;
* Routine Maintenance Activities and due dates.
* Site Activity Reports
* Defects currently active on their sites
* Current Quotations and status of quotations.
For further information, please reach out to one of our staff members and we will be happy to provide further information regarding this. | Redeemer Lutheran College | Redeemer Lutheran College | — | 15 May 2024 | 15 Aug 2024 | 15 Aug 2024 |
| Actioned | Q-0309Leading Fire Services are pleased to submit for your consideration our proposal for repairs identified during the recent inspection of the fire protection equipment.
Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply:
INCLUSIONS:
• Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays).
EXCLUSIONS:
• Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like.
• Work outside of Leading Fire Services normal working hours (as nominated above).
• Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step.
• Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames.
• Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered.
• Access to Energex locked rooms.
• If water isolation for repairs is not successful, costs will apply for pipe freeze.
NOTES & CONDITIONS:
• The Fire and Rescue Service Act 1990 (FRSA), section 104D states that "The occupier of a building must maintain at all times every prescribed fire safety installation to a standard of safety and reliability in the event of fire”.
• Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing.
• Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote.
• Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates.
• This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required.
• The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client.
• Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs.
• In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test.
We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.
As of 1 January 2024, Leading Fire is pleased to advise that we are now utilising the full client Portal features of our Maintenance Software. This allows our clients Portal access into our Software to review the health of their sites.
These features include the following;
* Routine Maintenance Activities and due dates.
* Site Activity Reports
* Defects currently active on their sites
* Current Quotations and status of quotations.
For further information, please reach out to one of our staff members and we will be happy to provide further information regarding this. | Progress Rail Redbank | Progress Rail | — | 15 May 2024 | 14 June 2024 | 14 June 2024 |
| Voided | Q-0308Leading Fire Services are pleased to submit for your consideration our proposal for repairs identified during the recent inspection of the fire protection equipment.
* The 5 Yearly Fire Hydrant System Service is due at PCYC Hervey Bay. In our quotation, we have included the following;
* Re-packing of 12 x Fire Hydrant Landing Valves.
* Re-packing of Fire Brigade Booster Assembly
* 5-Yearly Diesel Fire Pump Service.
* 5-Yearly Fire Hydrant Booster Flow Test.
* 5-Yearly Fire Hydrant Hydrostatic Test
* 5-Yearly Fire Hydrant System Flow Test (Most Disadvantaged location).
* Labour to carry out the above works.
* NOTE: For the Hydrostatic Test portion of these works, additional costs have been included in this quotation as required Pump unit to facilitate the Test will be supplied from Brisbane as we have been advised that this cannot be sourced locally.
Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply:
INCLUSIONS:
• Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays).
EXCLUSIONS:
• Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like.
• Work outside of Leading Fire Services normal working hours (as nominated above).
• Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step.
• Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames.
• Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered.
• Access to Energex locked rooms.
• If water isolation for repairs is not successful, costs will apply for pipe freeze.
NOTES & CONDITIONS:
• The Fire and Rescue Service Act 1990 (FRSA), section 104D states that "The occupier of a building must maintain at all times every prescribed fire safety installation to a standard of safety and reliability in the event of fire”.
• Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing.
• Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote.
• Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates.
• This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required.
• The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client.
• Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs.
• In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test.
We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.
As of 1 January 2024, Leading Fire is pleased to advise that we are now utilising the full client Portal features of our Maintenance Software. This allows our clients Portal access into our Software to review the health of their sites.
These features include the following;
* Routine Maintenance Activities and due dates.
* Site Activity Reports
* Defects currently active on their sites
* Current Quotations and status of quotations.
For further information, please reach out to one of our staff members and we will be happy to provide further information regarding this. | PCYC Hervey Bay | QLD Police Citizens Youth Welfare Association | — | 15 May 2024 | 31 July 2024 | 31 July 2024 |
| Voided | Q-0307Leading Fire Services are pleased to submit for your consideration our proposal for repairs identified during the recent inspection of the fire protection equipment.
* During Recent inspections, it has been identified that the mild steel Fire Hydrant Booster Cabinet which houses the Fire Brigade Booster Assemblies is severely corroded / rusted and is essentially falling apart. Extensive corrosion has occurred due to proximity to salt water. In our quotation, we have allowed for the following;
* Removal of the old mild steel Fire Hydrant Booster cabinet.
* Installation of a new replacement Fire Hydrant Booster cabinet - to be constructed from Aluminium.
* Disposal of old Steel Cabinet,
* NOTE: As mentioned above, due to the environmental conditions (Salt Water corrosion) present at this site, we have allowed to replace this corroded cabinet with a new cabinet constructed from Aluminium in order to prevent this from occurring again in the future. Due to this, this has attracted a higher cost. If you would like a quotation for replacement with the same Mild Steel construction, please advise and we will provide.
Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply:
INCLUSIONS:
• Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays).
EXCLUSIONS:
• Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like.
• Work outside of Leading Fire Services normal working hours (as nominated above).
• Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step.
• Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames.
• Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered.
• Access to Energex locked rooms.
• If water isolation for repairs is not successful, costs will apply for pipe freeze.
NOTES & CONDITIONS:
• The Fire and Rescue Service Act 1990 (FRSA), section 104D states that "The occupier of a building must maintain at all times every prescribed fire safety installation to a standard of safety and reliability in the event of fire”.
• Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing.
• Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote.
• Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates.
• This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required.
• The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client.
• Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs.
• In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test.
We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.
As of 1 January 2024, Leading Fire is pleased to advise that we are now utilising the full client Portal features of our Maintenance Software. This allows our clients Portal access into our Software to review the health of their sites.
These features include the following;
* Routine Maintenance Activities and due dates.
* Site Activity Reports
* Defects currently active on their sites
* Current Quotations and status of quotations.
For further information, please reach out to one of our staff members and we will be happy to provide further information regarding this. | PCYC Hervey Bay | QLD Police Citizens Youth Welfare Association | — | 15 May 2024 | 31 July 2024 | 31 July 2024 |
| Actioned | Q-0305Leading Fire Services are pleased to submit for your consideration our proposal for repairs identified during the recent inspection of the fire protection equipment.
* Whilst conducting the Emergency Evacuation Speaker Circuit Repair works in the Engine Rebuild / Admin Building, we disconnected 2 x Evacuation Speakers as these were the cause of the short circuit on the Speaker Circuit. These are required to be re-instated to complete the repair works.
Our quotation is for the following;
* Replacement of the existing vermin-damaged Evacuation Speakers located in the Paint Store and Oil Store in the Stores Section of Engine Re-build / Admin Building. New Evacuation Speaker cabling will also need to be installed for these repair works. Functional testing will be carried out on completion to ensure speaker circuit integrity.
** Please note: To carry out these repair works, use of the site's Scissor lift will be required. Pre-arrangement will be sort for the booking of this equipment.
Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply:
INCLUSIONS:
• Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays).
EXCLUSIONS:
• Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like.
• Work outside of Leading Fire Services normal working hours (as nominated above).
• Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step.
• Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames.
• Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered.
• Access to Energex locked rooms.
• If water isolation for repairs is not successful, costs will apply for pipe freeze.
NOTES & CONDITIONS:
• The Fire and Rescue Service Act 1990 (FRSA), section 104D states that "The occupier of a building must maintain at all times every prescribed fire safety installation to a standard of safety and reliability in the event of fire”.
• Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing.
• Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote.
• Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates.
• This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required.
• The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client.
• Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs.
• In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test.
We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.
As of 1 January 2024, Leading Fire is pleased to advise that we are now utilising the full client Portal features of our Maintenance Software. This allows our clients Portal access into our Software to review the health of their sites.
These features include the following;
* Routine Maintenance Activities and due dates.
* Site Activity Reports
* Defects currently active on their sites
* Current Quotations and status of quotations.
For further information, please reach out to one of our staff members and we will be happy to provide further information regarding this. | Progress Rail Redbank | Progress Rail | — | 15 May 2024 | 14 June 2024 | 14 June 2024 |
| Deleted | Q-0304Leading Fire Services are pleased to submit for your consideration our proposal for repairs identified during the recent inspection of the fire protection equipment.
Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply:
INCLUSIONS:
• Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays).
EXCLUSIONS:
• Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like.
• Work outside of Leading Fire Services normal working hours (as nominated above).
• Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step.
• Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames.
• Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered.
• Access to Energex locked rooms.
• If water isolation for repairs is not successful, costs will apply for pipe freeze.
NOTES & CONDITIONS:
• The Fire and Rescue Service Act 1990 (FRSA), section 104D states that "The occupier of a building must maintain at all times every prescribed fire safety installation to a standard of safety and reliability in the event of fire”.
• Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing.
• Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote.
• Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates.
• This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required.
• The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client.
• Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs.
• In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test.
We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us. | ROHR PTY LTD | Marmel Holdings Pty Ltd T/a Martogg Engineering Services | — | 15 May 2024 | 14 June 2024 | 14 June 2024 |
| Voided | Q-0294Leading Fire Services are pleased to submit for your consideration our proposal for repairs identified during the recent inspection of the fire protection equipment.
Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply:
INCLUSIONS:
• Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays).
EXCLUSIONS:
• Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like.
• Work outside of Leading Fire Services normal working hours (as nominated above).
• Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step.
• Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames.
• Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered.
• Access to Energex locked rooms.
• If water isolation for repairs is not successful, costs will apply for pipe freeze.
NOTES & CONDITIONS:
• The Fire and Rescue Service Act 1990 (FRSA), section 104D states that "The occupier of a building must maintain at all times every prescribed fire safety installation to a standard of safety and reliability in the event of fire”.
• Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing.
• Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote.
• Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates.
• This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required.
• The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client.
• Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs.
• In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test.
We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us. | PCYC Gold Coast | QLD Police Citizens Youth Welfare Association | — | 14 May 2024 | 13 June 2024 | 13 June 2024 |
| Voided | Q-0292Leading Fire Services are pleased to submit for your consideration our proposal for repairs identified during the recent inspection of the fire protection equipment.
Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply:
INCLUSIONS:
• Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays).
EXCLUSIONS:
• Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like.
• Work outside of Leading Fire Services normal working hours (as nominated above).
• Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step.
• Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames.
• Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered.
• Access to Energex locked rooms.
• If water isolation for repairs is not successful, costs will apply for pipe freeze.
NOTES & CONDITIONS:
• The Fire and Rescue Service Act 1990 (FRSA), section 104D states that "The occupier of a building must maintain at all times every prescribed fire safety installation to a standard of safety and reliability in the event of fire”.
• Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing.
• Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote.
• Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates.
• This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required.
• The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client.
• Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs.
• In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test.
We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us. | PCYC Inala | QLD Police Citizens Youth Welfare Association | — | 14 May 2024 | 30 Sept 2024 | 30 Sept 2024 |
| Voided | Q-0293Leading Fire Services are pleased to submit for your consideration our proposal for repairs identified during the recent inspection of the fire protection equipment.
Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply:
INCLUSIONS:
• Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays).
EXCLUSIONS:
• Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like.
• Work outside of Leading Fire Services normal working hours (as nominated above).
• Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step.
• Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames.
• Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered.
• Access to Energex locked rooms.
• If water isolation for repairs is not successful, costs will apply for pipe freeze.
NOTES & CONDITIONS:
• The Fire and Rescue Service Act 1990 (FRSA), section 104D states that "The occupier of a building must maintain at all times every prescribed fire safety installation to a standard of safety and reliability in the event of fire”.
• Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing.
• Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote.
• Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates.
• This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required.
• The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client.
• Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs.
• In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test.
We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us. | PCYC Inala | QLD Police Citizens Youth Welfare Association | — | 14 May 2024 | 30 Sept 2024 | 30 Sept 2024 |
| Voided | Q-0301Leading Fire Services are pleased to submit for your consideration our proposal for repairs identified during the recent inspection of the fire protection equipment.
Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply:
INCLUSIONS:
• Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays).
EXCLUSIONS:
• Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like.
• Work outside of Leading Fire Services normal working hours (as nominated above).
• Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step.
• Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames.
• Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered.
• Access to Energex locked rooms.
• If water isolation for repairs is not successful, costs will apply for pipe freeze.
NOTES & CONDITIONS:
• The Fire and Rescue Service Act 1990 (FRSA), section 104D states that "The occupier of a building must maintain at all times every prescribed fire safety installation to a standard of safety and reliability in the event of fire”.
• Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing.
• Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote.
• Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates.
• This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required.
• The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client.
• Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs.
• In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test.
We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us. | PCYC Bayside | QLD Police Citizens Youth Welfare Association | — | 14 May 2024 | 13 June 2024 | 13 June 2024 |
| Voided | Q-0300Leading Fire Services are pleased to submit for your consideration our proposal for repairs identified during the recent inspection of the fire protection equipment.
Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply:
INCLUSIONS:
• Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays).
EXCLUSIONS:
• Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like.
• Work outside of Leading Fire Services normal working hours (as nominated above).
• Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step.
• Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames.
• Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered.
• Access to Energex locked rooms.
• If water isolation for repairs is not successful, costs will apply for pipe freeze.
NOTES & CONDITIONS:
• The Fire and Rescue Service Act 1990 (FRSA), section 104D states that "The occupier of a building must maintain at all times every prescribed fire safety installation to a standard of safety and reliability in the event of fire”.
• Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing.
• Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote.
• Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates.
• This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required.
• The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client.
• Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs.
• In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test.
We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us. | PCYC Carindale | QLD Police Citizens Youth Welfare Association | — | 14 May 2024 | 13 June 2024 | 13 June 2024 |
| Voided | Q-0302Leading Fire Services are pleased to submit for your consideration our proposal for repairs identified during the recent inspection of the fire protection equipment.
Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply:
INCLUSIONS:
• Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays).
EXCLUSIONS:
• Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like.
• Work outside of Leading Fire Services normal working hours (as nominated above).
• Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step.
• Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames.
• Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered.
• Access to Energex locked rooms.
• If water isolation for repairs is not successful, costs will apply for pipe freeze.
NOTES & CONDITIONS:
• The Fire and Rescue Service Act 1990 (FRSA), section 104D states that "The occupier of a building must maintain at all times every prescribed fire safety installation to a standard of safety and reliability in the event of fire”.
• Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing.
• Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote.
• Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates.
• This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required.
• The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client.
• Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs.
• In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test.
We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us. | PCYC Ashmore | QLD Police Citizens Youth Welfare Association | — | 14 May 2024 | 13 June 2024 | 13 June 2024 |
| Actioned | Q-0299Leading Fire Services are pleased to submit for your consideration our proposal for repairs identified during the recent inspection of the fire protection equipment.
Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply:
INCLUSIONS:
• Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays).
EXCLUSIONS:
• Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like.
• Work outside of Leading Fire Services normal working hours (as nominated above).
• Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step.
• Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames.
• Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered.
• Access to Energex locked rooms.
• If water isolation for repairs is not successful, costs will apply for pipe freeze.
NOTES & CONDITIONS:
• The Fire and Rescue Service Act 1990 (FRSA), section 104D states that "The occupier of a building must maintain at all times every prescribed fire safety installation to a standard of safety and reliability in the event of fire”.
• Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing.
• Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote.
• Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates.
• This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required.
• The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client.
• Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs.
• In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test.
We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us. | PCYC Carindale | QLD Police Citizens Youth Welfare Association | — | 14 May 2024 | 13 June 2024 | 13 June 2024 |
| Actioned | Q-0298Leading Fire Services are pleased to submit for your consideration our proposal for repairs identified during the recent inspection of the fire protection equipment.
Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply:
INCLUSIONS:
• Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays).
EXCLUSIONS:
• Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like.
• Work outside of Leading Fire Services normal working hours (as nominated above).
• Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step.
• Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames.
• Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered.
• Access to Energex locked rooms.
• If water isolation for repairs is not successful, costs will apply for pipe freeze.
NOTES & CONDITIONS:
• The Fire and Rescue Service Act 1990 (FRSA), section 104D states that "The occupier of a building must maintain at all times every prescribed fire safety installation to a standard of safety and reliability in the event of fire”.
• Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing.
• Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote.
• Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates.
• This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required.
• The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client.
• Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs.
• In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test.
We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us. | PCYC Carindale | QLD Police Citizens Youth Welfare Association | — | 14 May 2024 | 13 June 2024 | 13 June 2024 |
| Voided | Q-0297Leading Fire Services are pleased to submit for your consideration our proposal for repairs identified during the recent inspection of the fire protection equipment.
Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply:
INCLUSIONS:
• Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays).
EXCLUSIONS:
• Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like.
• Work outside of Leading Fire Services normal working hours (as nominated above).
• Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step.
• Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames.
• Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered.
• Access to Energex locked rooms.
• If water isolation for repairs is not successful, costs will apply for pipe freeze.
NOTES & CONDITIONS:
• The Fire and Rescue Service Act 1990 (FRSA), section 104D states that "The occupier of a building must maintain at all times every prescribed fire safety installation to a standard of safety and reliability in the event of fire”.
• Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing.
• Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote.
• Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates.
• This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required.
• The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client.
• Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs.
• In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test.
We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us. | PCYC Fortitude Valley | QLD Police Citizens Youth Welfare Association | — | 14 May 2024 | 13 June 2024 | 13 June 2024 |
| Actioned | Q-0296Leading Fire Services are pleased to submit for your consideration our proposal for repairs identified during the recent inspection of the fire protection equipment.
Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply:
INCLUSIONS:
• Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays).
EXCLUSIONS:
• Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like.
• Work outside of Leading Fire Services normal working hours (as nominated above).
• Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step.
• Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames.
• Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered.
• Access to Energex locked rooms.
• If water isolation for repairs is not successful, costs will apply for pipe freeze.
NOTES & CONDITIONS:
• The Fire and Rescue Service Act 1990 (FRSA), section 104D states that "The occupier of a building must maintain at all times every prescribed fire safety installation to a standard of safety and reliability in the event of fire”.
• Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing.
• Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote.
• Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates.
• This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required.
• The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client.
• Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs.
• In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test.
We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us. | River 94.9 FM | Star Broadcasting Pty Ltd t/a River FM | — | 14 May 2024 | 13 June 2024 | 13 June 2024 |
| Actioned | Q-0295Leading Fire Services are pleased to submit for your consideration our proposal for repairs identified during the recent inspection of the fire protection equipment.
Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply:
INCLUSIONS:
• Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays).
EXCLUSIONS:
• Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like.
• Work outside of Leading Fire Services normal working hours (as nominated above).
• Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step.
• Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames.
• Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered.
• Access to Energex locked rooms.
• If water isolation for repairs is not successful, costs will apply for pipe freeze.
NOTES & CONDITIONS:
• The Fire and Rescue Service Act 1990 (FRSA), section 104D states that "The occupier of a building must maintain at all times every prescribed fire safety installation to a standard of safety and reliability in the event of fire”.
• Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing.
• Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote.
• Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates.
• This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required.
• The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client.
• Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs.
• In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test.
We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us. | River 94.9 FM | Star Broadcasting Pty Ltd t/a River FM | — | 14 May 2024 | 13 June 2024 | 13 June 2024 |