| Actioned | Q-1182***Following a routine inspection, a number of defects were identified that require attention to maintain safety, performance, and overall condition. The below quotation outlines the recommended works to address these items and prevent further deterioration.***
The Building Fire Safety Regulation 2008, Part 5 Prescribed fire safety installations, Division 3 Obligations of occupiers, 54 Maintenance of prescribed fire safety installations Part 4 states that:
(4) The occupier of the building must ensure the repair is carried
out or the corrective action is taken no later than 1 month after
the maintenance of the installation was carried out, unless the
occupier has a reasonable excuse.
Examples of a reasonable excuse—
• No appropriately qualified person was available to attend the
occupier’s premises to carry out the repair or take the corrective
action because of the remoteness of the building’s location.
• The repair or corrective action was not able to be finished because
of the complexity of the work involved or delay in obtaining parts
required for the repair or corrective action.
Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply:
INCLUSIONS:
• Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays).
EXCLUSIONS:
• Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like.
• Work outside of Leading Fire Services normal working hours (as nominated above).
• Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step.
• Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames.
• Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered.
• Access to Energex locked rooms.
• If water isolation for repairs is not successful or we are asked to re-instate the water for any reason, additional costs will apply for a revisit.
NOTES & CONDITIONS:
• Leading Fire Services standard trading terms apply. A copy of our trading terms can be provided on request.
• Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing.
• Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote.
• Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates.
• This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required.
• The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client.
• Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs.
• In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test.
We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us. | Le Sommet | Le Sommet | — | 2 Sept 2026 | 2 Oct 2026 | 1 Nov 2026 |
| Actioned | Q-1174***Following a routine inspection, a number of defects were identified that require attention to maintain safety, performance, and overall condition. The below quotation outlines the recommended works to address these items and prevent further deterioration.***
The Building Fire Safety Regulation 2008, Part 5 Prescribed fire safety installations, Division 3 Obligations of occupiers, 54 Maintenance of prescribed fire safety installations Part 4 states that:
(4) The occupier of the building must ensure the repair is carried
out or the corrective action is taken no later than 1 month after
the maintenance of the installation was carried out, unless the
occupier has a reasonable excuse.
Examples of a reasonable excuse—
• No appropriately qualified person was available to attend the
occupier’s premises to carry out the repair or take the corrective
action because of the remoteness of the building’s location.
• The repair or corrective action was not able to be finished because
of the complexity of the work involved or delay in obtaining parts
required for the repair or corrective action.
Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply:
INCLUSIONS:
• Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays).
EXCLUSIONS:
• Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like.
• Work outside of Leading Fire Services normal working hours (as nominated above).
• Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step.
• Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames.
• Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered.
• Access to Energex locked rooms.
• If water isolation for repairs is not successful or we are asked to re-instate the water for any reason, additional costs will apply for a revisit.
NOTES & CONDITIONS:
• Leading Fire Services standard trading terms apply. A copy of our trading terms can be provided on request.
• Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing.
• Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote.
• Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates.
• This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required.
• The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client.
• Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs.
• In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test.
We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us. | Sullivan Nicolaides Pathology Pottsville | Sullivan Nicolaides Pathology | — | 31 Aug 2026 | 30 Sept 2026 | 30 Oct 2026 |
| Actioned | Q-1173***Following a routine inspection, a number of defects were identified that require attention to maintain safety, performance, and overall condition. The below quotation outlines the recommended works to address these items and prevent further deterioration.***
The Building Fire Safety Regulation 2008, Part 5 Prescribed fire safety installations, Division 3 Obligations of occupiers, 54 Maintenance of prescribed fire safety installations Part 4 states that:
(4) The occupier of the building must ensure the repair is carried
out or the corrective action is taken no later than 1 month after
the maintenance of the installation was carried out, unless the
occupier has a reasonable excuse.
Examples of a reasonable excuse—
• No appropriately qualified person was available to attend the
occupier’s premises to carry out the repair or take the corrective
action because of the remoteness of the building’s location.
• The repair or corrective action was not able to be finished because
of the complexity of the work involved or delay in obtaining parts
required for the repair or corrective action.
Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply:
INCLUSIONS:
• Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays).
EXCLUSIONS:
• Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like.
• Work outside of Leading Fire Services normal working hours (as nominated above).
• Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step.
• Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames.
• Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered.
• Access to Energex locked rooms.
• If water isolation for repairs is not successful or we are asked to re-instate the water for any reason, additional costs will apply for a revisit.
NOTES & CONDITIONS:
• Leading Fire Services standard trading terms apply. A copy of our trading terms can be provided on request.
• Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing.
• Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote.
• Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates.
• This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required.
• The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client.
• Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs.
• In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test.
We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us. | Sullivan Nicolaides Pathology Banora Point | Sullivan Nicolaides Pathology | — | 31 Aug 2026 | 30 Sept 2026 | 30 Oct 2026 |
| Actioned | Q-1166***Following a routine inspection, a number of defects were identified that require attention to maintain safety, performance, and overall condition. The below quotation outlines the recommended works to address these items and prevent further deterioration.***
The Building Fire Safety Regulation 2008, Part 5 Prescribed fire safety installations, Division 3 Obligations of occupiers, 54 Maintenance of prescribed fire safety installations Part 4 states that:
(4) The occupier of the building must ensure the repair is carried
out or the corrective action is taken no later than 1 month after
the maintenance of the installation was carried out, unless the
occupier has a reasonable excuse.
Examples of a reasonable excuse—
• No appropriately qualified person was available to attend the
occupier’s premises to carry out the repair or take the corrective
action because of the remoteness of the building’s location.
• The repair or corrective action was not able to be finished because
of the complexity of the work involved or delay in obtaining parts
required for the repair or corrective action.
Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply:
INCLUSIONS:
• Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays).
EXCLUSIONS:
• Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like.
• Work outside of Leading Fire Services normal working hours (as nominated above).
• Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step.
• Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames.
• Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered.
• Access to Energex locked rooms.
• If water isolation for repairs is not successful or we are asked to re-instate the water for any reason, additional costs will apply for a revisit.
NOTES & CONDITIONS:
• Leading Fire Services standard trading terms apply. A copy of our trading terms can be provided on request.
• Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing.
• Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote.
• Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates.
• This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required.
• The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client.
• Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs.
• In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test.
We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us. | Yarrabilba Veterinary Hospital, 55-61 Adler Cct, Yarrabilba | Yarrabilba Veterinary Hospital | — | 25 Aug 2026 | 25 Sept 2026 | 24 Oct 2026 |
| Actioned | Q-1167***Following a routine inspection, a number of defects were identified that require attention to maintain safety, performance, and overall condition. The below quotation outlines the recommended works to address these items and prevent further deterioration.***
The Building Fire Safety Regulation 2008, Part 5 Prescribed fire safety installations, Division 3 Obligations of occupiers, 54 Maintenance of prescribed fire safety installations Part 4 states that:
(4) The occupier of the building must ensure the repair is carried
out or the corrective action is taken no later than 1 month after
the maintenance of the installation was carried out, unless the
occupier has a reasonable excuse.
Examples of a reasonable excuse—
• No appropriately qualified person was available to attend the
occupier’s premises to carry out the repair or take the corrective
action because of the remoteness of the building’s location.
• The repair or corrective action was not able to be finished because
of the complexity of the work involved or delay in obtaining parts
required for the repair or corrective action.
Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply:
INCLUSIONS:
• Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays).
EXCLUSIONS:
• Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like.
• Work outside of Leading Fire Services normal working hours (as nominated above).
• Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step.
• Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames.
• Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered.
• Access to Energex locked rooms.
• If water isolation for repairs is not successful or we are asked to re-instate the water for any reason, additional costs will apply for a revisit.
NOTES & CONDITIONS:
• Leading Fire Services standard trading terms apply. A copy of our trading terms can be provided on request.
• Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing.
• Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote.
• Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates.
• This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required.
• The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client.
• Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs.
• In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test.
We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us. | Yarrabilba Veterinary Hospital, 55-61 Adler Cct, Yarrabilba | Yarrabilba Veterinary Hospital | — | 25 Aug 2026 | 25 Sept 2026 | 24 Oct 2026 |
| Actioned | Q-1160***Following a routine inspection, a number of defects were identified that require attention to maintain safety, performance, and overall condition. The below quotation outlines the recommended works to address these items and prevent further deterioration.***
The Building Fire Safety Regulation 2008, Part 5 Prescribed fire safety installations, Division 3 Obligations of occupiers, 54 Maintenance of prescribed fire safety installations Part 4 states that:
(4) The occupier of the building must ensure the repair is carried
out or the corrective action is taken no later than 1 month after
the maintenance of the installation was carried out, unless the
occupier has a reasonable excuse.
Examples of a reasonable excuse—
• No appropriately qualified person was available to attend the
occupier’s premises to carry out the repair or take the corrective
action because of the remoteness of the building’s location.
• The repair or corrective action was not able to be finished because
of the complexity of the work involved or delay in obtaining parts
required for the repair or corrective action.
Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply:
INCLUSIONS:
• Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays).
EXCLUSIONS:
• Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like.
• Work outside of Leading Fire Services normal working hours (as nominated above).
• Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step.
• Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames.
• Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered.
• Access to Energex locked rooms.
• If water isolation for repairs is not successful or we are asked to re-instate the water for any reason, additional costs will apply for a revisit.
NOTES & CONDITIONS:
• Leading Fire Services standard trading terms apply. A copy of our trading terms can be provided on request.
• Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing.
• Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote.
• Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates.
• This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required.
• The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client.
• Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs.
• In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test.
We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us. | Christine Court - Assisted Living | Assisted Living Australia | — | 17 Aug 2026 | 17 Sept 2026 | 16 Oct 2026 |
| Actioned | Q-1159***Following a routine inspection, a number of defects were identified that require attention to maintain safety, performance, and overall condition. The below quotation outlines the recommended works to address these items and prevent further deterioration.***
The Building Fire Safety Regulation 2008, Part 5 Prescribed fire safety installations, Division 3 Obligations of occupiers, 54 Maintenance of prescribed fire safety installations Part 4 states that:
(4) The occupier of the building must ensure the repair is carried
out or the corrective action is taken no later than 1 month after
the maintenance of the installation was carried out, unless the
occupier has a reasonable excuse.
Examples of a reasonable excuse—
• No appropriately qualified person was available to attend the
occupier’s premises to carry out the repair or take the corrective
action because of the remoteness of the building’s location.
• The repair or corrective action was not able to be finished because
of the complexity of the work involved or delay in obtaining parts
required for the repair or corrective action.
Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply:
INCLUSIONS:
• Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays).
EXCLUSIONS:
• Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like.
• Work outside of Leading Fire Services normal working hours (as nominated above).
• Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step.
• Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames.
• Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered.
• Access to Energex locked rooms.
• If water isolation for repairs is not successful or we are asked to re-instate the water for any reason, additional costs will apply for a revisit.
NOTES & CONDITIONS:
• Leading Fire Services standard trading terms apply. A copy of our trading terms can be provided on request.
• Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing.
• Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote.
• Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates.
• This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required.
• The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client.
• Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs.
• In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test.
We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us. | Le Sommet | Le Sommet | — | 17 Aug 2026 | 17 Sept 2026 | 16 Oct 2026 |
| Actioned | Q-1156***Following a routine inspection, a number of defects were identified that require attention to maintain safety, performance, and overall condition. The below quotation outlines the recommended works to address these items and prevent further deterioration.***
The Building Fire Safety Regulation 2008, Part 5 Prescribed fire safety installations, Division 3 Obligations of occupiers, 54 Maintenance of prescribed fire safety installations Part 4 states that:
(4) The occupier of the building must ensure the repair is carried
out or the corrective action is taken no later than 1 month after
the maintenance of the installation was carried out, unless the
occupier has a reasonable excuse.
Examples of a reasonable excuse—
• No appropriately qualified person was available to attend the
occupier’s premises to carry out the repair or take the corrective
action because of the remoteness of the building’s location.
• The repair or corrective action was not able to be finished because
of the complexity of the work involved or delay in obtaining parts
required for the repair or corrective action.
Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply:
INCLUSIONS:
• Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays).
EXCLUSIONS:
• Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like.
• Work outside of Leading Fire Services normal working hours (as nominated above).
• Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step.
• Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames.
• Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered.
• Access to Energex locked rooms.
• If water isolation for repairs is not successful or we are asked to re-instate the water for any reason, additional costs will apply for a revisit.
NOTES & CONDITIONS:
• Leading Fire Services standard trading terms apply. A copy of our trading terms can be provided on request.
• Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing.
• Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote.
• Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates.
• This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required.
• The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client.
• Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs.
• In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test.
We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us. | 51-73 The Lanes Boulevard | Bao Li Investments Pty Ltd ATF | — | 6 Aug 2026 | 6 Sept 2026 | 5 Oct 2026 |
| Actioned | Q-1154***Following a routine inspection, a number of defects were identified that require attention to maintain safety, performance, and overall condition. The below quotation outlines the recommended works to address these items and prevent further deterioration.***
The Building Fire Safety Regulation 2008, Part 5 Prescribed fire safety installations, Division 3 Obligations of occupiers, 54 Maintenance of prescribed fire safety installations Part 4 states that:
(4) The occupier of the building must ensure the repair is carried
out or the corrective action is taken no later than 1 month after
the maintenance of the installation was carried out, unless the
occupier has a reasonable excuse.
Examples of a reasonable excuse—
• No appropriately qualified person was available to attend the
occupier’s premises to carry out the repair or take the corrective
action because of the remoteness of the building’s location.
• The repair or corrective action was not able to be finished because
of the complexity of the work involved or delay in obtaining parts
required for the repair or corrective action.
Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply:
INCLUSIONS:
• Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays).
EXCLUSIONS:
• Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like.
• Work outside of Leading Fire Services normal working hours (as nominated above).
• Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step.
• Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames.
• Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered.
• Access to Energex locked rooms.
• If water isolation for repairs is not successful or we are asked to re-instate the water for any reason, additional costs will apply for a revisit.
NOTES & CONDITIONS:
• Leading Fire Services standard trading terms apply. A copy of our trading terms can be provided on request.
• Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing.
• Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote.
• Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates.
• This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required.
• The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client.
• Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs.
• In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test.
We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us. | Airefrig Australia - 29-35 Huntington Pl, Banyo | Airefrig Australia Pty Ltd | — | 2 Aug 2026 | 2 Sept 2026 | 1 Oct 2026 |
| Actioned | Q-1153***Following a routine inspection, a number of defects were identified that require attention to maintain safety, performance, and overall condition. The below quotation outlines the recommended works to address these items and prevent further deterioration.***
The Building Fire Safety Regulation 2008, Part 5 Prescribed fire safety installations, Division 3 Obligations of occupiers, 54 Maintenance of prescribed fire safety installations Part 4 states that:
(4) The occupier of the building must ensure the repair is carried
out or the corrective action is taken no later than 1 month after
the maintenance of the installation was carried out, unless the
occupier has a reasonable excuse.
Examples of a reasonable excuse—
• No appropriately qualified person was available to attend the
occupier’s premises to carry out the repair or take the corrective
action because of the remoteness of the building’s location.
• The repair or corrective action was not able to be finished because
of the complexity of the work involved or delay in obtaining parts
required for the repair or corrective action.
Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply:
INCLUSIONS:
• Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays).
EXCLUSIONS:
• Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like.
• Work outside of Leading Fire Services normal working hours (as nominated above).
• Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step.
• Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames.
• Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered.
• Access to Energex locked rooms.
• If water isolation for repairs is not successful or we are asked to re-instate the water for any reason, additional costs will apply for a revisit.
NOTES & CONDITIONS:
• Leading Fire Services standard trading terms apply. A copy of our trading terms can be provided on request.
• Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing.
• Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote.
• Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates.
• This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required.
• The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client.
• Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs.
• In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test.
We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us. | Airefrig Australia - 29-35 Huntington Pl, Banyo | Airefrig Australia Pty Ltd | — | 2 Aug 2026 | 2 Sept 2026 | 1 Oct 2026 |
| Actioned | Q-1152***Following a routine inspection, a number of defects were identified that require attention to maintain safety, performance, and overall condition. The below quotation outlines the recommended works to address these items and prevent further deterioration.***
The Building Fire Safety Regulation 2008, Part 5 Prescribed fire safety installations, Division 3 Obligations of occupiers, 54 Maintenance of prescribed fire safety installations Part 4 states that:
(4) The occupier of the building must ensure the repair is carried
out or the corrective action is taken no later than 1 month after
the maintenance of the installation was carried out, unless the
occupier has a reasonable excuse.
Examples of a reasonable excuse—
• No appropriately qualified person was available to attend the
occupier’s premises to carry out the repair or take the corrective
action because of the remoteness of the building’s location.
• The repair or corrective action was not able to be finished because
of the complexity of the work involved or delay in obtaining parts
required for the repair or corrective action.
Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply:
INCLUSIONS:
• Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays).
EXCLUSIONS:
• Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like.
• Work outside of Leading Fire Services normal working hours (as nominated above).
• Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step.
• Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames.
• Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered.
• Access to Energex locked rooms.
• If water isolation for repairs is not successful or we are asked to re-instate the water for any reason, additional costs will apply for a revisit.
NOTES & CONDITIONS:
• Leading Fire Services standard trading terms apply. A copy of our trading terms can be provided on request.
• Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing.
• Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote.
• Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates.
• This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required.
• The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client.
• Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs.
• In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test.
We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us. | Sullivan Nicolaides Pathology 4 Page Ct, Highland Park | Sullivan Nicolaides Pathology | — | 31 July 2026 | 31 Aug 2026 | 29 Sept 2026 |
| Actioned | Q-1148***Following a routine inspection, it was identified that the existing 9.0kg ABE fire extinguisher had lost all pressure and was well past its lifecycle. The below quotation outlines the recommended works to address these items and prevent further deterioration.***
The Building Fire Safety Regulation 2008, Part 5 Prescribed fire safety installations, Division 3 Obligations of occupiers, 54 Maintenance of prescribed fire safety installations Part 4 states that:
(4) The occupier of the building must ensure the repair is carried
out or the corrective action is taken no later than 1 month after
the maintenance of the installation was carried out, unless the
occupier has a reasonable excuse.
Examples of a reasonable excuse—
• No appropriately qualified person was available to attend the
occupier’s premises to carry out the repair or take the corrective
action because of the remoteness of the building’s location.
• The repair or corrective action was not able to be finished because
of the complexity of the work involved or delay in obtaining parts
required for the repair or corrective action.
Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply:
INCLUSIONS:
• Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays).
EXCLUSIONS:
• Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like.
• Work outside of Leading Fire Services normal working hours (as nominated above).
• Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step.
• Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames.
• Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered.
• Access to Energex locked rooms.
• If water isolation for repairs is not successful or we are asked to re-instate the water for any reason, additional costs will apply for a revisit.
NOTES & CONDITIONS:
• Leading Fire Services standard trading terms apply. A copy of our trading terms can be provided on request.
• Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing.
• Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote.
• Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates.
• This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required.
• The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client.
• Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs.
• In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test.
We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us. | 1/9 Pendrey Ct | Ray White AKG | — | 30 July 2026 | 30 Aug 2026 | 28 Sept 2026 |
| Actioned | Q-1149***Following a routine inspection, it was identified that the existing fire extinguishers were well beyond their lifecycle and not in an operational condition. The below quotation outlines the recommended works to address these items and prevent further deterioration.***
The Building Fire Safety Regulation 2008, Part 5 Prescribed fire safety installations, Division 3 Obligations of occupiers, 54 Maintenance of prescribed fire safety installations Part 4 states that:
(4) The occupier of the building must ensure the repair is carried
out or the corrective action is taken no later than 1 month after
the maintenance of the installation was carried out, unless the
occupier has a reasonable excuse.
Examples of a reasonable excuse—
• No appropriately qualified person was available to attend the
occupier’s premises to carry out the repair or take the corrective
action because of the remoteness of the building’s location.
• The repair or corrective action was not able to be finished because
of the complexity of the work involved or delay in obtaining parts
required for the repair or corrective action.
Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply:
INCLUSIONS:
• Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays).
EXCLUSIONS:
• Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like.
• Work outside of Leading Fire Services normal working hours (as nominated above).
• Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step.
• Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames.
• Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered.
• Access to Energex locked rooms.
• If water isolation for repairs is not successful or we are asked to re-instate the water for any reason, additional costs will apply for a revisit.
NOTES & CONDITIONS:
• Leading Fire Services standard trading terms apply. A copy of our trading terms can be provided on request.
• Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing.
• Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote.
• Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates.
• This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required.
• The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client.
• Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs.
• In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test.
We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us. | 4/9 Pendrey Ct | Ray White AKG | — | 30 July 2026 | 30 Aug 2026 | 28 Sept 2026 |
| Actioned | Q-1141***Following a routine inspection, a number of defects were identified that require attention to maintain safety, performance, and overall condition. The below quotation outlines the recommended works to address these items and prevent further deterioration.***
The Building Fire Safety Regulation 2008, Part 5 Prescribed fire safety installations, Division 3 Obligations of occupiers, 54 Maintenance of prescribed fire safety installations Part 4 states that:
(4) The occupier of the building must ensure the repair is carried
out or the corrective action is taken no later than 1 month after
the maintenance of the installation was carried out, unless the
occupier has a reasonable excuse.
Examples of a reasonable excuse—
• No appropriately qualified person was available to attend the
occupier’s premises to carry out the repair or take the corrective
action because of the remoteness of the building’s location.
• The repair or corrective action was not able to be finished because
of the complexity of the work involved or delay in obtaining parts
required for the repair or corrective action.
Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply:
INCLUSIONS:
• Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays).
EXCLUSIONS:
• Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like.
• Work outside of Leading Fire Services normal working hours (as nominated above).
• Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step.
• Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames.
• Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered.
• Access to Energex locked rooms.
• If water isolation for repairs is not successful or we are asked to re-instate the water for any reason, additional costs will apply for a revisit.
NOTES & CONDITIONS:
• Leading Fire Services standard trading terms apply. A copy of our trading terms can be provided on request.
• Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing.
• Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote.
• Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates.
• This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required.
• The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client.
• Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs.
• In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test.
We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us. | 144 Brisbane Street | 144 Brisbane Street | — | 15 July 2026 | 15 Aug 2026 | 13 Sept 2026 |
| Actioned | Q-1135***Following a routine inspection, a number of defects were identified that require attention to maintain safety, performance, and overall condition. The below quotation outlines the recommended works to address these items and prevent further deterioration.***
The Building Fire Safety Regulation 2008, Part 5 Prescribed fire safety installations, Division 3 Obligations of occupiers, 54 Maintenance of prescribed fire safety installations Part 4 states that:
(4) The occupier of the building must ensure the repair is carried
out or the corrective action is taken no later than 1 month after
the maintenance of the installation was carried out, unless the
occupier has a reasonable excuse.
Examples of a reasonable excuse—
• No appropriately qualified person was available to attend the
occupier’s premises to carry out the repair or take the corrective
action because of the remoteness of the building’s location.
• The repair or corrective action was not able to be finished because
of the complexity of the work involved or delay in obtaining parts
required for the repair or corrective action.
Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply:
INCLUSIONS:
• Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays).
EXCLUSIONS:
• Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like.
• Work outside of Leading Fire Services normal working hours (as nominated above).
• Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step.
• Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames.
• Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered.
• Access to Energex locked rooms.
• If water isolation for repairs is not successful or we are asked to re-instate the water for any reason, additional costs will apply for a revisit.
NOTES & CONDITIONS:
• Leading Fire Services standard trading terms apply. A copy of our trading terms can be provided on request.
• Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing.
• Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote.
• Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates.
• This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required.
• The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client.
• Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs.
• In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test.
We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us. | Brigidine College | Brigidine College | — | 2 July 2026 | 2 Aug 2026 | 31 Aug 2026 |
| Actioned | Q-1130**Leading Fire Services are pleased to submit for your consideration our proposal for the supply and installation of the evacuation diagrams for the laundry, Lodge, Heritage and maintenance shed.**
**Clarifications and Inclusions.**
**1. Our price is based on floor plans being made available for us to use during the mark up process. Should floor plans not be available, additional costs will be incurred for Leading Fire Services to have them drafted.
2. We have allowed for a single site visit for marking up of equipment locations.
3. Our pricing includes 1 x free client amendment to the evacuation diagrams. Each amendment thereafter will attract an additional fee.
4. We have taken our quantities from the information provided.** | Cabanda Care | Cabanda Care | — | 24 June 2026 | 24 July 2026 | 23 Aug 2026 |
| Actioned | Q-1128***Following a routine inspection, a number of defects were identified that require attention to maintain safety, performance, and overall condition. The below quotation outlines the recommended works to address these items and prevent further deterioration.***
The Building Fire Safety Regulation 2008, Part 5 Prescribed fire safety installations, Division 3 Obligations of occupiers, 54 Maintenance of prescribed fire safety installations Part 4 states that:
(4) The occupier of the building must ensure the repair is carried
out or the corrective action is taken no later than 1 month after
the maintenance of the installation was carried out, unless the
occupier has a reasonable excuse.
Examples of a reasonable excuse—
• No appropriately qualified person was available to attend the
occupier’s premises to carry out the repair or take the corrective
action because of the remoteness of the building’s location.
• The repair or corrective action was not able to be finished because
of the complexity of the work involved or delay in obtaining parts
required for the repair or corrective action.
Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply:
INCLUSIONS:
• Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays).
EXCLUSIONS:
• Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like.
• Work outside of Leading Fire Services normal working hours (as nominated above).
• Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step.
• Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames.
• Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered.
• Access to Energex locked rooms.
• If water isolation for repairs is not successful or we are asked to re-instate the water for any reason, additional costs will apply for a revisit.
NOTES & CONDITIONS:
• Leading Fire Services standard trading terms apply. A copy of our trading terms can be provided on request.
• Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing.
• Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote.
• Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates.
• This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required.
• The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client.
• Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs.
• In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test.
We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us. | 43 Boydaw Rd, Ormeau (DSPM) | Disability Support Property Management (Ray White Bell Group) | — | 22 June 2026 | 22 July 2026 | 21 Aug 2026 |
| Actioned | Q-1129***Following a routine inspection, a number of defects were identified that require attention to maintain safety, performance, and overall condition. The below quotation outlines the recommended works to address these items and prevent further deterioration.***
The Building Fire Safety Regulation 2008, Part 5 Prescribed fire safety installations, Division 3 Obligations of occupiers, 54 Maintenance of prescribed fire safety installations Part 4 states that:
(4) The occupier of the building must ensure the repair is carried
out or the corrective action is taken no later than 1 month after
the maintenance of the installation was carried out, unless the
occupier has a reasonable excuse.
Examples of a reasonable excuse—
• No appropriately qualified person was available to attend the
occupier’s premises to carry out the repair or take the corrective
action because of the remoteness of the building’s location.
• The repair or corrective action was not able to be finished because
of the complexity of the work involved or delay in obtaining parts
required for the repair or corrective action.
Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply:
INCLUSIONS:
• Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays).
EXCLUSIONS:
• Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like.
• Work outside of Leading Fire Services normal working hours (as nominated above).
• Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step.
• Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames.
• Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered.
• Access to Energex locked rooms.
• If water isolation for repairs is not successful or we are asked to re-instate the water for any reason, additional costs will apply for a revisit.
NOTES & CONDITIONS:
• Leading Fire Services standard trading terms apply. A copy of our trading terms can be provided on request.
• Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing.
• Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote.
• Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates.
• This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required.
• The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client.
• Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs.
• In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test.
We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us. | River 94.9 FM | Star Broadcasting Pty Ltd t/a River FM | — | 22 June 2026 | 22 July 2026 | 21 Aug 2026 |
| Actioned | Q-1125***Following a routine inspection, a number of defects were identified that require attention to maintain safety, performance, and overall condition. The below quotation outlines the recommended works to address these items and prevent further deterioration.***
The Building Fire Safety Regulation 2008, Part 5 Prescribed fire safety installations, Division 3 Obligations of occupiers, 54 Maintenance of prescribed fire safety installations Part 4 states that:
(4) The occupier of the building must ensure the repair is carried
out or the corrective action is taken no later than 1 month after
the maintenance of the installation was carried out, unless the
occupier has a reasonable excuse.
Examples of a reasonable excuse—
• No appropriately qualified person was available to attend the
occupier’s premises to carry out the repair or take the corrective
action because of the remoteness of the building’s location.
• The repair or corrective action was not able to be finished because
of the complexity of the work involved or delay in obtaining parts
required for the repair or corrective action.
Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply:
INCLUSIONS:
• Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays).
EXCLUSIONS:
• Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like.
• Work outside of Leading Fire Services normal working hours (as nominated above).
• Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step.
• Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames.
• Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered.
• Access to Energex locked rooms.
• If water isolation for repairs is not successful or we are asked to re-instate the water for any reason, additional costs will apply for a revisit.
NOTES & CONDITIONS:
• Leading Fire Services standard trading terms apply. A copy of our trading terms can be provided on request.
• Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing.
• Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote.
• Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates.
• This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required.
• The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client.
• Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs.
• In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test.
We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us. | Ingrams Australia Pty Ltd | Ingrams Australia Pty Ltd | — | 9 June 2026 | 9 July 2026 | 8 Aug 2026 |
| Actioned | Q-1124***Following a routine inspection, a number of defects were identified that require attention to maintain safety, performance, and overall condition. The below quotation outlines the recommended works to address these items and prevent further deterioration.***
The Building Fire Safety Regulation 2008, Part 5 Prescribed fire safety installations, Division 3 Obligations of occupiers, 54 Maintenance of prescribed fire safety installations Part 4 states that:
(4) The occupier of the building must ensure the repair is carried
out or the corrective action is taken no later than 1 month after
the maintenance of the installation was carried out, unless the
occupier has a reasonable excuse.
Examples of a reasonable excuse—
• No appropriately qualified person was available to attend the
occupier’s premises to carry out the repair or take the corrective
action because of the remoteness of the building’s location.
• The repair or corrective action was not able to be finished because
of the complexity of the work involved or delay in obtaining parts
required for the repair or corrective action.
Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply:
INCLUSIONS:
• Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays).
EXCLUSIONS:
• Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like.
• Work outside of Leading Fire Services normal working hours (as nominated above).
• Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step.
• Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames.
• Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered.
• Access to Energex locked rooms.
• If water isolation for repairs is not successful or we are asked to re-instate the water for any reason, additional costs will apply for a revisit.
NOTES & CONDITIONS:
• Leading Fire Services standard trading terms apply. A copy of our trading terms can be provided on request.
• Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing.
• Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote.
• Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates.
• This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required.
• The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client.
• Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs.
• In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test.
We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us. | Ingrams Australia Pty Ltd | Ingrams Australia Pty Ltd | — | 9 June 2026 | 9 July 2026 | 8 Aug 2026 |
| Actioned | Q-1126***Following a routine inspection, a number of defects were identified that require attention to maintain safety, performance, and overall condition. The below quotation outlines the recommended works to address these items and prevent further deterioration.***
The Building Fire Safety Regulation 2008, Part 5 Prescribed fire safety installations, Division 3 Obligations of occupiers, 54 Maintenance of prescribed fire safety installations Part 4 states that:
(4) The occupier of the building must ensure the repair is carried
out or the corrective action is taken no later than 1 month after
the maintenance of the installation was carried out, unless the
occupier has a reasonable excuse.
Examples of a reasonable excuse—
• No appropriately qualified person was available to attend the
occupier’s premises to carry out the repair or take the corrective
action because of the remoteness of the building’s location.
• The repair or corrective action was not able to be finished because
of the complexity of the work involved or delay in obtaining parts
required for the repair or corrective action.
Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply:
INCLUSIONS:
• Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays).
EXCLUSIONS:
• Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like.
• Work outside of Leading Fire Services normal working hours (as nominated above).
• Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step.
• Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames.
• Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered.
• Access to Energex locked rooms.
• If water isolation for repairs is not successful or we are asked to re-instate the water for any reason, additional costs will apply for a revisit.
NOTES & CONDITIONS:
• Leading Fire Services standard trading terms apply. A copy of our trading terms can be provided on request.
• Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing.
• Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote.
• Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates.
• This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required.
• The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client.
• Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs.
• In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test.
We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us. | Ingrams Australia Pty Ltd | Ingrams Australia Pty Ltd | — | 9 June 2026 | 9 July 2026 | 8 Aug 2026 |
| Actioned | Q-1123***Following a routine inspection, a number of defects were identified that require attention to maintain safety, performance, and overall condition. The below quotation outlines the recommended works to address these items and prevent further deterioration.***
The Building Fire Safety Regulation 2008, Part 5 Prescribed fire safety installations, Division 3 Obligations of occupiers, 54 Maintenance of prescribed fire safety installations Part 4 states that:
(4) The occupier of the building must ensure the repair is carried
out or the corrective action is taken no later than 1 month after
the maintenance of the installation was carried out, unless the
occupier has a reasonable excuse.
Examples of a reasonable excuse—
• No appropriately qualified person was available to attend the
occupier’s premises to carry out the repair or take the corrective
action because of the remoteness of the building’s location.
• The repair or corrective action was not able to be finished because
of the complexity of the work involved or delay in obtaining parts
required for the repair or corrective action.
Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply:
INCLUSIONS:
• Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays).
EXCLUSIONS:
• Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like.
• Work outside of Leading Fire Services normal working hours (as nominated above).
• Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step.
• Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames.
• Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered.
• Access to Energex locked rooms.
• If water isolation for repairs is not successful or we are asked to re-instate the water for any reason, additional costs will apply for a revisit.
NOTES & CONDITIONS:
• Leading Fire Services standard trading terms apply. A copy of our trading terms can be provided on request.
• Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing.
• Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote.
• Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates.
• This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required.
• The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client.
• Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs.
• In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test.
We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us. | Kilargo | Kilargo | — | 8 June 2026 | 8 July 2026 | 7 Aug 2026 |
| Actioned | Q-1122***Following a routine inspection, a number of defects were identified that require attention to maintain safety, performance, and overall condition. The below quotation outlines the recommended works to address these items and prevent further deterioration.***
The Building Fire Safety Regulation 2008, Part 5 Prescribed fire safety installations, Division 3 Obligations of occupiers, 54 Maintenance of prescribed fire safety installations Part 4 states that:
(4) The occupier of the building must ensure the repair is carried
out or the corrective action is taken no later than 1 month after
the maintenance of the installation was carried out, unless the
occupier has a reasonable excuse.
Examples of a reasonable excuse—
• No appropriately qualified person was available to attend the
occupier’s premises to carry out the repair or take the corrective
action because of the remoteness of the building’s location.
• The repair or corrective action was not able to be finished because
of the complexity of the work involved or delay in obtaining parts
required for the repair or corrective action.
Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply:
INCLUSIONS:
• Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays).
EXCLUSIONS:
• Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like.
• Work outside of Leading Fire Services normal working hours (as nominated above).
• Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step.
• Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames.
• Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered.
• Access to Energex locked rooms.
• If water isolation for repairs is not successful or we are asked to re-instate the water for any reason, additional costs will apply for a revisit.
NOTES & CONDITIONS:
• Leading Fire Services standard trading terms apply. A copy of our trading terms can be provided on request.
• Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing.
• Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote.
• Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates.
• This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required.
• The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client.
• Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs.
• In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test.
We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us. | Kilargo | Kilargo | — | 8 June 2026 | 8 July 2026 | 7 Aug 2026 |
| Actioned | Q-1120***Following a routine inspection, a number of defects were identified that require attention to maintain safety, performance, and overall condition. The below quotation outlines the recommended works to address these items and prevent further deterioration.***
The Building Fire Safety Regulation 2008, Part 5 Prescribed fire safety installations, Division 3 Obligations of occupiers, 54 Maintenance of prescribed fire safety installations Part 4 states that:
(4) The occupier of the building must ensure the repair is carried
out or the corrective action is taken no later than 1 month after
the maintenance of the installation was carried out, unless the
occupier has a reasonable excuse.
Examples of a reasonable excuse—
• No appropriately qualified person was available to attend the
occupier’s premises to carry out the repair or take the corrective
action because of the remoteness of the building’s location.
• The repair or corrective action was not able to be finished because
of the complexity of the work involved or delay in obtaining parts
required for the repair or corrective action.
Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply:
INCLUSIONS:
• Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays).
EXCLUSIONS:
• Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like.
• Work outside of Leading Fire Services normal working hours (as nominated above).
• Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step.
• Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames.
• Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered.
• Access to Energex locked rooms.
• If water isolation for repairs is not successful or we are asked to re-instate the water for any reason, additional costs will apply for a revisit.
NOTES & CONDITIONS:
• Leading Fire Services standard trading terms apply. A copy of our trading terms can be provided on request.
• Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing.
• Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote.
• Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates.
• This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required.
• The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client.
• Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs.
• In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test.
We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us. | GYMPIE SOUTHSIDE TOWN CENTRE - 1 Woolgar St Gympie | MDT Property and Energy | — | 2 June 2026 | 2 July 2026 | 1 Aug 2026 |
| Actioned | Q-1115***Following a routine inspection, a number of defects were identified that require attention to maintain safety, performance, and overall condition. The below quotation outlines the recommended works to address these items and prevent further deterioration.***
The Building Fire Safety Regulation 2008, Part 5 Prescribed fire safety installations, Division 3 Obligations of occupiers, 54 Maintenance of prescribed fire safety installations Part 4 states that:
(4) The occupier of the building must ensure the repair is carried
out or the corrective action is taken no later than 1 month after
the maintenance of the installation was carried out, unless the
occupier has a reasonable excuse.
Examples of a reasonable excuse—
• No appropriately qualified person was available to attend the
occupier’s premises to carry out the repair or take the corrective
action because of the remoteness of the building’s location.
• The repair or corrective action was not able to be finished because
of the complexity of the work involved or delay in obtaining parts
required for the repair or corrective action.
Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply:
INCLUSIONS:
• Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays).
EXCLUSIONS:
• Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like.
• Work outside of Leading Fire Services normal working hours (as nominated above).
• Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step.
• Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames.
• Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered.
• Access to Energex locked rooms.
• If water isolation for repairs is not successful or we are asked to re-instate the water for any reason, additional costs will apply for a revisit.
NOTES & CONDITIONS:
• Leading Fire Services standard trading terms apply. A copy of our trading terms can be provided on request.
• Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing.
• Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote.
• Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates.
• This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required.
• The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client.
• Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs.
• In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test.
We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us. | Ritchies IGA - 58 High St, Boonah | Primal Systems | — | 29 May 2026 | 29 June 2026 | 31 Aug 2026 |
| Actioned | Q-1118***Following a routine inspection, a number of defects were identified that require attention to maintain safety, performance, and overall condition. The below quotation outlines the recommended works to address these items and prevent further deterioration.***
The Building Fire Safety Regulation 2008, Part 5 Prescribed fire safety installations, Division 3 Obligations of occupiers, 54 Maintenance of prescribed fire safety installations Part 4 states that:
(4) The occupier of the building must ensure the repair is carried
out or the corrective action is taken no later than 1 month after
the maintenance of the installation was carried out, unless the
occupier has a reasonable excuse.
Examples of a reasonable excuse—
• No appropriately qualified person was available to attend the
occupier’s premises to carry out the repair or take the corrective
action because of the remoteness of the building’s location.
• The repair or corrective action was not able to be finished because
of the complexity of the work involved or delay in obtaining parts
required for the repair or corrective action.
Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply:
INCLUSIONS:
• Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays).
EXCLUSIONS:
• Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like.
• Work outside of Leading Fire Services normal working hours (as nominated above).
• Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step.
• Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames.
• Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered.
• Access to Energex locked rooms.
• If water isolation for repairs is not successful or we are asked to re-instate the water for any reason, additional costs will apply for a revisit.
NOTES & CONDITIONS:
• Leading Fire Services standard trading terms apply. A copy of our trading terms can be provided on request.
• Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing.
• Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote.
• Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates.
• This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required.
• The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client.
• Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs.
• In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test.
We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us. | Ritchies IGA - 3-5 Cupania St, Daisy Hill | Primal Systems | — | 29 May 2026 | 29 June 2026 | 31 Aug 2026 |
| Actioned | Q-1119***Following a routine inspection, a number of defects were identified that require attention to maintain safety, performance, and overall condition. The below quotation outlines the recommended works to address these items and prevent further deterioration.***
The Building Fire Safety Regulation 2008, Part 5 Prescribed fire safety installations, Division 3 Obligations of occupiers, 54 Maintenance of prescribed fire safety installations Part 4 states that:
(4) The occupier of the building must ensure the repair is carried
out or the corrective action is taken no later than 1 month after
the maintenance of the installation was carried out, unless the
occupier has a reasonable excuse.
Examples of a reasonable excuse—
• No appropriately qualified person was available to attend the
occupier’s premises to carry out the repair or take the corrective
action because of the remoteness of the building’s location.
• The repair or corrective action was not able to be finished because
of the complexity of the work involved or delay in obtaining parts
required for the repair or corrective action.
Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply:
INCLUSIONS:
• Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays).
EXCLUSIONS:
• Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like.
• Work outside of Leading Fire Services normal working hours (as nominated above).
• Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step.
• Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames.
• Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered.
• Access to Energex locked rooms.
• If water isolation for repairs is not successful or we are asked to re-instate the water for any reason, additional costs will apply for a revisit.
NOTES & CONDITIONS:
• Leading Fire Services standard trading terms apply. A copy of our trading terms can be provided on request.
• Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing.
• Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote.
• Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates.
• This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required.
• The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client.
• Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs.
• In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test.
We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us. | Ritchies IGA - 3-5 Cupania St, Daisy Hill | Primal Systems | — | 29 May 2026 | 29 June 2026 | 31 Aug 2026 |
| Actioned | Q-1116***Following a routine inspection, a number of defects were identified that require attention to maintain safety, performance, and overall condition. The below quotation outlines the recommended works to address these items and prevent further deterioration.***
The Building Fire Safety Regulation 2008, Part 5 Prescribed fire safety installations, Division 3 Obligations of occupiers, 54 Maintenance of prescribed fire safety installations Part 4 states that:
(4) The occupier of the building must ensure the repair is carried
out or the corrective action is taken no later than 1 month after
the maintenance of the installation was carried out, unless the
occupier has a reasonable excuse.
Examples of a reasonable excuse—
• No appropriately qualified person was available to attend the
occupier’s premises to carry out the repair or take the corrective
action because of the remoteness of the building’s location.
• The repair or corrective action was not able to be finished because
of the complexity of the work involved or delay in obtaining parts
required for the repair or corrective action.
Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply:
INCLUSIONS:
• Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays).
EXCLUSIONS:
• Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like.
• Work outside of Leading Fire Services normal working hours (as nominated above).
• Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step.
• Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames.
• Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered.
• Access to Energex locked rooms.
• If water isolation for repairs is not successful or we are asked to re-instate the water for any reason, additional costs will apply for a revisit.
NOTES & CONDITIONS:
• Leading Fire Services standard trading terms apply. A copy of our trading terms can be provided on request.
• Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing.
• Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote.
• Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates.
• This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required.
• The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client.
• Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs.
• In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test.
We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us. | Ritchies IGA - 58 High St, Boonah | Primal Systems | — | 29 May 2026 | 29 June 2026 | 31 Aug 2026 |
| Actioned | Q-1117***Following a routine inspection, a number of defects were identified that require attention to maintain safety, performance, and overall condition. The below quotation outlines the recommended works to address these items and prevent further deterioration.***
The Building Fire Safety Regulation 2008, Part 5 Prescribed fire safety installations, Division 3 Obligations of occupiers, 54 Maintenance of prescribed fire safety installations Part 4 states that:
(4) The occupier of the building must ensure the repair is carried
out or the corrective action is taken no later than 1 month after
the maintenance of the installation was carried out, unless the
occupier has a reasonable excuse.
Examples of a reasonable excuse—
• No appropriately qualified person was available to attend the
occupier’s premises to carry out the repair or take the corrective
action because of the remoteness of the building’s location.
• The repair or corrective action was not able to be finished because
of the complexity of the work involved or delay in obtaining parts
required for the repair or corrective action.
Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply:
INCLUSIONS:
• Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays).
EXCLUSIONS:
• Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like.
• Work outside of Leading Fire Services normal working hours (as nominated above).
• Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step.
• Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames.
• Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered.
• Access to Energex locked rooms.
• If water isolation for repairs is not successful or we are asked to re-instate the water for any reason, additional costs will apply for a revisit.
NOTES & CONDITIONS:
• Leading Fire Services standard trading terms apply. A copy of our trading terms can be provided on request.
• Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing.
• Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote.
• Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates.
• This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required.
• The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client.
• Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs.
• In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test.
We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us. | Ritchies IGA - 3-5 Cupania St, Daisy Hill | Primal Systems | — | 29 May 2026 | 29 June 2026 | 31 Aug 2026 |
| Actioned | Q-1104***Following a routine inspection, a number of defects were identified that require attention to maintain safety, performance, and overall condition. The below quotation outlines the recommended works to address these items and prevent further deterioration.***
The Building Fire Safety Regulation 2008, Part 5 Prescribed fire safety installations, Division 3 Obligations of occupiers, 54 Maintenance of prescribed fire safety installations Part 4 states that:
(4) The occupier of the building must ensure the repair is carried
out or the corrective action is taken no later than 1 month after
the maintenance of the installation was carried out, unless the
occupier has a reasonable excuse.
Examples of a reasonable excuse—
• No appropriately qualified person was available to attend the
occupier’s premises to carry out the repair or take the corrective
action because of the remoteness of the building’s location.
• The repair or corrective action was not able to be finished because
of the complexity of the work involved or delay in obtaining parts
required for the repair or corrective action.
Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply:
INCLUSIONS:
• Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays).
EXCLUSIONS:
• Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like.
• Work outside of Leading Fire Services normal working hours (as nominated above).
• Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step.
• Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames.
• Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered.
• Access to Energex locked rooms.
• If water isolation for repairs is not successful or we are asked to re-instate the water for any reason, additional costs will apply for a revisit.
NOTES & CONDITIONS:
• Leading Fire Services standard trading terms apply. A copy of our trading terms can be provided on request.
• Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing.
• Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote.
• Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates.
• This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required.
• The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client.
• Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs.
• In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test.
We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us. | Banksia Beach Shopping Village | MDT Property and Energy | — | 26 May 2026 | 26 June 2026 | 25 July 2026 |
| Actioned | Q-1102***Following a routine inspection, a number of defects were identified that require attention to maintain safety, performance, and overall condition. The below quotation outlines the recommended works to address these items and prevent further deterioration.***
The Building Fire Safety Regulation 2008, Part 5 Prescribed fire safety installations, Division 3 Obligations of occupiers, 54 Maintenance of prescribed fire safety installations Part 4 states that:
(4) The occupier of the building must ensure the repair is carried
out or the corrective action is taken no later than 1 month after
the maintenance of the installation was carried out, unless the
occupier has a reasonable excuse.
Examples of a reasonable excuse—
• No appropriately qualified person was available to attend the
occupier’s premises to carry out the repair or take the corrective
action because of the remoteness of the building’s location.
• The repair or corrective action was not able to be finished because
of the complexity of the work involved or delay in obtaining parts
required for the repair or corrective action.
Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply:
INCLUSIONS:
• Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays).
EXCLUSIONS:
• Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like.
• Work outside of Leading Fire Services normal working hours (as nominated above).
• Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step.
• Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames.
• Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered.
• Access to Energex locked rooms.
• If water isolation for repairs is not successful or we are asked to re-instate the water for any reason, additional costs will apply for a revisit.
NOTES & CONDITIONS:
• Leading Fire Services standard trading terms apply. A copy of our trading terms can be provided on request.
• Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing.
• Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote.
• Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates.
• This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required.
• The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client.
• Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs.
• In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test.
We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us. | 18 Franklin Street | Body Corp.18 Franklin Street, Annerley CTS35071 | — | 24 May 2026 | 24 June 2026 | 23 July 2026 |
| Actioned | Q-1099***Following a routine inspection, a number of defects were identified that require attention to maintain safety, performance, and overall condition. The below quotation outlines the recommended works to address these items and prevent further deterioration.***
The Building Fire Safety Regulation 2008, Part 5 Prescribed fire safety installations, Division 3 Obligations of occupiers, 54 Maintenance of prescribed fire safety installations Part 4 states that:
(4) The occupier of the building must ensure the repair is carried
out or the corrective action is taken no later than 1 month after
the maintenance of the installation was carried out, unless the
occupier has a reasonable excuse.
Examples of a reasonable excuse—
• No appropriately qualified person was available to attend the
occupier’s premises to carry out the repair or take the corrective
action because of the remoteness of the building’s location.
• The repair or corrective action was not able to be finished because
of the complexity of the work involved or delay in obtaining parts
required for the repair or corrective action.
Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply:
INCLUSIONS:
• Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays).
EXCLUSIONS:
• Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like.
• Work outside of Leading Fire Services normal working hours (as nominated above).
• Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step.
• Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames.
• Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered.
• Access to Energex locked rooms.
• If water isolation for repairs is not successful or we are asked to re-instate the water for any reason, additional costs will apply for a revisit.
NOTES & CONDITIONS:
• Leading Fire Services standard trading terms apply. A copy of our trading terms can be provided on request.
• Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing.
• Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote.
• Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates.
• This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required.
• The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client.
• Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs.
• In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test.
We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us. | Freedom Forklifts - 54 Spencer Rd, Nerang | Freedom Forklifts Pty Ltd | — | 24 May 2026 | 24 June 2026 | 23 July 2026 |
| Actioned | Q-1100***Following a routine inspection, a number of defects were identified that require attention to maintain safety, performance, and overall condition. The below quotation outlines the recommended works to address these items and prevent further deterioration.***
The Building Fire Safety Regulation 2008, Part 5 Prescribed fire safety installations, Division 3 Obligations of occupiers, 54 Maintenance of prescribed fire safety installations Part 4 states that:
(4) The occupier of the building must ensure the repair is carried
out or the corrective action is taken no later than 1 month after
the maintenance of the installation was carried out, unless the
occupier has a reasonable excuse.
Examples of a reasonable excuse—
• No appropriately qualified person was available to attend the
occupier’s premises to carry out the repair or take the corrective
action because of the remoteness of the building’s location.
• The repair or corrective action was not able to be finished because
of the complexity of the work involved or delay in obtaining parts
required for the repair or corrective action.
Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply:
INCLUSIONS:
• Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays).
EXCLUSIONS:
• Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like.
• Work outside of Leading Fire Services normal working hours (as nominated above).
• Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step.
• Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames.
• Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered.
• Access to Energex locked rooms.
• If water isolation for repairs is not successful or we are asked to re-instate the water for any reason, additional costs will apply for a revisit.
NOTES & CONDITIONS:
• Leading Fire Services standard trading terms apply. A copy of our trading terms can be provided on request.
• Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing.
• Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote.
• Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates.
• This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required.
• The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client.
• Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs.
• In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test.
We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us. | Freedom Forklifts - 54 Spencer Rd, Nerang | Freedom Forklifts Pty Ltd | — | 24 May 2026 | 24 June 2026 | 23 July 2026 |
| Actioned | Q-1098***Following a routine inspection, a number of defects were identified that require attention to maintain safety, performance, and overall condition. The below quotation outlines the recommended works to address these items and prevent further deterioration.***
The Building Fire Safety Regulation 2008, Part 5 Prescribed fire safety installations, Division 3 Obligations of occupiers, 54 Maintenance of prescribed fire safety installations Part 4 states that:
(4) The occupier of the building must ensure the repair is carried
out or the corrective action is taken no later than 1 month after
the maintenance of the installation was carried out, unless the
occupier has a reasonable excuse.
Examples of a reasonable excuse—
• No appropriately qualified person was available to attend the
occupier’s premises to carry out the repair or take the corrective
action because of the remoteness of the building’s location.
• The repair or corrective action was not able to be finished because
of the complexity of the work involved or delay in obtaining parts
required for the repair or corrective action.
Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply:
INCLUSIONS:
• Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays).
EXCLUSIONS:
• Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like.
• Work outside of Leading Fire Services normal working hours (as nominated above).
• Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step.
• Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames.
• Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered.
• Access to Energex locked rooms.
• If water isolation for repairs is not successful or we are asked to re-instate the water for any reason, additional costs will apply for a revisit.
NOTES & CONDITIONS:
• Leading Fire Services standard trading terms apply. A copy of our trading terms can be provided on request.
• Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing.
• Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote.
• Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates.
• This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required.
• The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client.
• Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs.
• In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test.
We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us. | Hope Island | Orchid Avenue Realty Pty Ltd | — | 22 May 2026 | 22 June 2026 | 21 July 2026 |
| Actioned | Q-1097***Following a routine inspection, a number of defects were identified that require attention to maintain safety, performance, and overall condition. The below quotation outlines the recommended works to address these items and prevent further deterioration.***
The Building Fire Safety Regulation 2008, Part 5 Prescribed fire safety installations, Division 3 Obligations of occupiers, 54 Maintenance of prescribed fire safety installations Part 4 states that:
(4) The occupier of the building must ensure the repair is carried
out or the corrective action is taken no later than 1 month after
the maintenance of the installation was carried out, unless the
occupier has a reasonable excuse.
Examples of a reasonable excuse—
• No appropriately qualified person was available to attend the
occupier’s premises to carry out the repair or take the corrective
action because of the remoteness of the building’s location.
• The repair or corrective action was not able to be finished because
of the complexity of the work involved or delay in obtaining parts
required for the repair or corrective action.
Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply:
INCLUSIONS:
• Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays).
EXCLUSIONS:
• Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like.
• Work outside of Leading Fire Services normal working hours (as nominated above).
• Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step.
• Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames.
• Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered.
• Access to Energex locked rooms.
• If water isolation for repairs is not successful or we are asked to re-instate the water for any reason, additional costs will apply for a revisit.
NOTES & CONDITIONS:
• Leading Fire Services standard trading terms apply. A copy of our trading terms can be provided on request.
• Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing.
• Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote.
• Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates.
• This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required.
• The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client.
• Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs.
• In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test.
We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us. | 144 Brisbane Street | 144 Brisbane Street | — | 15 May 2026 | 15 June 2026 | 14 July 2026 |
| Actioned | Q-1096***Following a routine inspection, a number of defects were identified that require attention to maintain safety, performance, and overall condition. The below quotation outlines the recommended works to address these items and prevent further deterioration.***
The Building Fire Safety Regulation 2008, Part 5 Prescribed fire safety installations, Division 3 Obligations of occupiers, 54 Maintenance of prescribed fire safety installations Part 4 states that:
(4) The occupier of the building must ensure the repair is carried
out or the corrective action is taken no later than 1 month after
the maintenance of the installation was carried out, unless the
occupier has a reasonable excuse.
Examples of a reasonable excuse—
• No appropriately qualified person was available to attend the
occupier’s premises to carry out the repair or take the corrective
action because of the remoteness of the building’s location.
• The repair or corrective action was not able to be finished because
of the complexity of the work involved or delay in obtaining parts
required for the repair or corrective action.
Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply:
INCLUSIONS:
• Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays).
EXCLUSIONS:
• Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like.
• Work outside of Leading Fire Services normal working hours (as nominated above).
• Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step.
• Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames.
• Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered.
• Access to Energex locked rooms.
• If water isolation for repairs is not successful or we are asked to re-instate the water for any reason, additional costs will apply for a revisit.
NOTES & CONDITIONS:
• Leading Fire Services standard trading terms apply. A copy of our trading terms can be provided on request.
• Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing.
• Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote.
• Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates.
• This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required.
• The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client.
• Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs.
• In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test.
We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us. | Freedom Forklifts - 61 Cuthbert Dr, Yatala | Freedom Forklifts Pty Ltd | — | 15 May 2026 | 15 June 2026 | 14 July 2026 |
| Actioned | Q-1090***Following a routine inspection, a number of defects were identified that require attention to maintain safety, performance, and overall condition. The below quotation outlines the recommended works to address these items and prevent further deterioration.***
The Building Fire Safety Regulation 2008, Part 5 Prescribed fire safety installations, Division 3 Obligations of occupiers, 54 Maintenance of prescribed fire safety installations Part 4 states that:
(4) The occupier of the building must ensure the repair is carried
out or the corrective action is taken no later than 1 month after
the maintenance of the installation was carried out, unless the
occupier has a reasonable excuse.
Examples of a reasonable excuse—
• No appropriately qualified person was available to attend the
occupier’s premises to carry out the repair or take the corrective
action because of the remoteness of the building’s location.
• The repair or corrective action was not able to be finished because
of the complexity of the work involved or delay in obtaining parts
required for the repair or corrective action.
Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply:
INCLUSIONS:
• Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays).
EXCLUSIONS:
• Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like.
• Work outside of Leading Fire Services normal working hours (as nominated above).
• Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step.
• Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames.
• Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered.
• Access to Energex locked rooms.
• If water isolation for repairs is not successful or we are asked to re-instate the water for any reason, additional costs will apply for a revisit.
NOTES & CONDITIONS:
• Leading Fire Services standard trading terms apply. A copy of our trading terms can be provided on request.
• Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing.
• Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote.
• Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates.
• This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required.
• The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client.
• Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs.
• In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test.
We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us. | AVIS - 3 Lawrence Dr, Nerang | Cecil Enterprises Pty Ltd | — | 15 May 2026 | 15 June 2026 | 14 July 2026 |
| Actioned | Q-1091***Following a routine inspection, a number of defects were identified that require attention to maintain safety, performance, and overall condition. The below quotation outlines the recommended works to address these items and prevent further deterioration.***
The Building Fire Safety Regulation 2008, Part 5 Prescribed fire safety installations, Division 3 Obligations of occupiers, 54 Maintenance of prescribed fire safety installations Part 4 states that:
(4) The occupier of the building must ensure the repair is carried
out or the corrective action is taken no later than 1 month after
the maintenance of the installation was carried out, unless the
occupier has a reasonable excuse.
Examples of a reasonable excuse—
• No appropriately qualified person was available to attend the
occupier’s premises to carry out the repair or take the corrective
action because of the remoteness of the building’s location.
• The repair or corrective action was not able to be finished because
of the complexity of the work involved or delay in obtaining parts
required for the repair or corrective action.
Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply:
INCLUSIONS:
• Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays).
EXCLUSIONS:
• Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like.
• Work outside of Leading Fire Services normal working hours (as nominated above).
• Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step.
• Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames.
• Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered.
• Access to Energex locked rooms.
• If water isolation for repairs is not successful or we are asked to re-instate the water for any reason, additional costs will apply for a revisit.
NOTES & CONDITIONS:
• Leading Fire Services standard trading terms apply. A copy of our trading terms can be provided on request.
• Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing.
• Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote.
• Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates.
• This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required.
• The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client.
• Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs.
• In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test.
We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us. | AVIS - 3 Lawrence Dr, Nerang | Cecil Enterprises Pty Ltd | — | 15 May 2026 | 15 June 2026 | 14 July 2026 |
| Actioned | Q-1092***Following a routine inspection, a number of defects were identified that require attention to maintain safety, performance, and overall condition. The below quotation outlines the recommended works to address these items and prevent further deterioration.***
The Building Fire Safety Regulation 2008, Part 5 Prescribed fire safety installations, Division 3 Obligations of occupiers, 54 Maintenance of prescribed fire safety installations Part 4 states that:
(4) The occupier of the building must ensure the repair is carried
out or the corrective action is taken no later than 1 month after
the maintenance of the installation was carried out, unless the
occupier has a reasonable excuse.
Examples of a reasonable excuse—
• No appropriately qualified person was available to attend the
occupier’s premises to carry out the repair or take the corrective
action because of the remoteness of the building’s location.
• The repair or corrective action was not able to be finished because
of the complexity of the work involved or delay in obtaining parts
required for the repair or corrective action.
Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply:
INCLUSIONS:
• Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays).
EXCLUSIONS:
• Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like.
• Work outside of Leading Fire Services normal working hours (as nominated above).
• Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step.
• Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames.
• Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered.
• Access to Energex locked rooms.
• If water isolation for repairs is not successful or we are asked to re-instate the water for any reason, additional costs will apply for a revisit.
NOTES & CONDITIONS:
• Leading Fire Services standard trading terms apply. A copy of our trading terms can be provided on request.
• Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing.
• Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote.
• Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates.
• This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required.
• The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client.
• Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs.
• In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test.
We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us. | AVIS - 3 Lawrence Dr, Nerang | Cecil Enterprises Pty Ltd | — | 15 May 2026 | 15 June 2026 | 14 July 2026 |
| Actioned | Q-1093***Following a routine inspection, a number of defects were identified that require attention to maintain safety, performance, and overall condition. The below quotation outlines the recommended works to address these items and prevent further deterioration.***
The Building Fire Safety Regulation 2008, Part 5 Prescribed fire safety installations, Division 3 Obligations of occupiers, 54 Maintenance of prescribed fire safety installations Part 4 states that:
(4) The occupier of the building must ensure the repair is carried
out or the corrective action is taken no later than 1 month after
the maintenance of the installation was carried out, unless the
occupier has a reasonable excuse.
Examples of a reasonable excuse—
• No appropriately qualified person was available to attend the
occupier’s premises to carry out the repair or take the corrective
action because of the remoteness of the building’s location.
• The repair or corrective action was not able to be finished because
of the complexity of the work involved or delay in obtaining parts
required for the repair or corrective action.
Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply:
INCLUSIONS:
• Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays).
EXCLUSIONS:
• Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like.
• Work outside of Leading Fire Services normal working hours (as nominated above).
• Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step.
• Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames.
• Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered.
• Access to Energex locked rooms.
• If water isolation for repairs is not successful or we are asked to re-instate the water for any reason, additional costs will apply for a revisit.
NOTES & CONDITIONS:
• Leading Fire Services standard trading terms apply. A copy of our trading terms can be provided on request.
• Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing.
• Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote.
• Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates.
• This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required.
• The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client.
• Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs.
• In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test.
We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us. | Comfort Hotel Cleveland | Comfort Hotel Cleveland | — | 15 May 2026 | 15 June 2026 | 14 July 2026 |
| Actioned | Q-1094***Following a routine inspection, a number of defects were identified that require attention to maintain safety, performance, and overall condition. The below quotation outlines the recommended works to address these items and prevent further deterioration.***
The Building Fire Safety Regulation 2008, Part 5 Prescribed fire safety installations, Division 3 Obligations of occupiers, 54 Maintenance of prescribed fire safety installations Part 4 states that:
(4) The occupier of the building must ensure the repair is carried
out or the corrective action is taken no later than 1 month after
the maintenance of the installation was carried out, unless the
occupier has a reasonable excuse.
Examples of a reasonable excuse—
• No appropriately qualified person was available to attend the
occupier’s premises to carry out the repair or take the corrective
action because of the remoteness of the building’s location.
• The repair or corrective action was not able to be finished because
of the complexity of the work involved or delay in obtaining parts
required for the repair or corrective action.
Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply:
INCLUSIONS:
• Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays).
EXCLUSIONS:
• Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like.
• Work outside of Leading Fire Services normal working hours (as nominated above).
• Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step.
• Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames.
• Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered.
• Access to Energex locked rooms.
• If water isolation for repairs is not successful or we are asked to re-instate the water for any reason, additional costs will apply for a revisit.
NOTES & CONDITIONS:
• Leading Fire Services standard trading terms apply. A copy of our trading terms can be provided on request.
• Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing.
• Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote.
• Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates.
• This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required.
• The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client.
• Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs.
• In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test.
We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us. | Comfort Hotel Cleveland | Comfort Hotel Cleveland | — | 15 May 2026 | 15 June 2026 | 14 July 2026 |
| Actioned | Q-1095***Following a routine inspection, a number of defects were identified that require attention to maintain safety, performance, and overall condition. The below quotation outlines the recommended works to address these items and prevent further deterioration.***
The Building Fire Safety Regulation 2008, Part 5 Prescribed fire safety installations, Division 3 Obligations of occupiers, 54 Maintenance of prescribed fire safety installations Part 4 states that:
(4) The occupier of the building must ensure the repair is carried
out or the corrective action is taken no later than 1 month after
the maintenance of the installation was carried out, unless the
occupier has a reasonable excuse.
Examples of a reasonable excuse—
• No appropriately qualified person was available to attend the
occupier’s premises to carry out the repair or take the corrective
action because of the remoteness of the building’s location.
• The repair or corrective action was not able to be finished because
of the complexity of the work involved or delay in obtaining parts
required for the repair or corrective action.
Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply:
INCLUSIONS:
• Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays).
EXCLUSIONS:
• Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like.
• Work outside of Leading Fire Services normal working hours (as nominated above).
• Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step.
• Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames.
• Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered.
• Access to Energex locked rooms.
• If water isolation for repairs is not successful or we are asked to re-instate the water for any reason, additional costs will apply for a revisit.
NOTES & CONDITIONS:
• Leading Fire Services standard trading terms apply. A copy of our trading terms can be provided on request.
• Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing.
• Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote.
• Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates.
• This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required.
• The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client.
• Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs.
• In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test.
We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us. | Freedom Forklifts - 61 Cuthbert Dr, Yatala | Freedom Forklifts Pty Ltd | — | 15 May 2026 | 15 June 2026 | 14 July 2026 |
| Actioned | Q-1089**Leading Fire Services are pleased to submit for your consideration our proposal for the supply and installation of the evacuation diagrams as outlined below.**
**Clarifications and Inclusions.**
**1. Our price is based on floor plans being made available for us to use during the mark up process. Should floor plans not be available, additional costs will be incurred for Leading Fire Services to have them drafted.
2. We have allowed for a single site visit for marking up of equipment locations.
3. Our pricing includes 1 x free client amendment to the evacuation diagrams. Each amendment thereafter will attract an additional fee.
4. We have taken our quantities from the information provided.** | Ellenborough House | Ellenborough House | — | 8 May 2026 | 8 June 2026 | 7 July 2026 |
| Actioned | Q-1087***Following a routine inspection, a number of defects were identified that require attention to maintain safety, performance, and overall condition. The below quotation outlines the recommended works to address these items and prevent further deterioration.***
The Building Fire Safety Regulation 2008, Part 5 Prescribed fire safety installations, Division 3 Obligations of occupiers, 54 Maintenance of prescribed fire safety installations Part 4 states that:
(4) The occupier of the building must ensure the repair is carried
out or the corrective action is taken no later than 1 month after
the maintenance of the installation was carried out, unless the
occupier has a reasonable excuse.
Examples of a reasonable excuse—
• No appropriately qualified person was available to attend the
occupier’s premises to carry out the repair or take the corrective
action because of the remoteness of the building’s location.
• The repair or corrective action was not able to be finished because
of the complexity of the work involved or delay in obtaining parts
required for the repair or corrective action.
Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply:
INCLUSIONS:
• Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays).
EXCLUSIONS:
• Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like.
• Work outside of Leading Fire Services normal working hours (as nominated above).
• Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step.
• Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames.
• Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered.
• Access to Energex locked rooms.
• If water isolation for repairs is not successful or we are asked to re-instate the water for any reason, additional costs will apply for a revisit.
NOTES & CONDITIONS:
• Leading Fire Services standard trading terms apply. A copy of our trading terms can be provided on request.
• Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing.
• Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote.
• Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates.
• This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required.
• The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client.
• Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs.
• In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test.
We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us. | Banksia Beach Shopping Village | MDT Property and Energy | — | 7 May 2026 | 7 June 2026 | 6 July 2026 |
| Actioned | Q-1085***Following a routine inspection, a number of defects were identified that require attention to maintain safety, performance, and overall condition. The below quotation outlines the recommended works to address these items and prevent further deterioration.***
The Building Fire Safety Regulation 2008, Part 5 Prescribed fire safety installations, Division 3 Obligations of occupiers, 54 Maintenance of prescribed fire safety installations Part 4 states that:
(4) The occupier of the building must ensure the repair is carried
out or the corrective action is taken no later than 1 month after
the maintenance of the installation was carried out, unless the
occupier has a reasonable excuse.
Examples of a reasonable excuse—
• No appropriately qualified person was available to attend the
occupier’s premises to carry out the repair or take the corrective
action because of the remoteness of the building’s location.
• The repair or corrective action was not able to be finished because
of the complexity of the work involved or delay in obtaining parts
required for the repair or corrective action.
Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply:
INCLUSIONS:
• Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays).
EXCLUSIONS:
• Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like.
• Work outside of Leading Fire Services normal working hours (as nominated above).
• Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step.
• Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames.
• Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered.
• Access to Energex locked rooms.
• If water isolation for repairs is not successful or we are asked to re-instate the water for any reason, additional costs will apply for a revisit.
NOTES & CONDITIONS:
• Leading Fire Services standard trading terms apply. A copy of our trading terms can be provided on request.
• Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing.
• Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote.
• Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates.
• This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required.
• The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client.
• Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs.
• In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test.
We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us. | Samin - 65 Nealdon Dr, Meadowbrook | Samin Sheet Metal Pty Ltd | — | 6 May 2026 | 6 June 2026 | 5 July 2026 |
| Actioned | Q-1083***Following a routine inspection, a number of defects were identified that require attention to maintain safety, performance, and overall condition. The below quotation outlines the recommended works to address these items and prevent further deterioration.***
The Building Fire Safety Regulation 2008, Part 5 Prescribed fire safety installations, Division 3 Obligations of occupiers, 54 Maintenance of prescribed fire safety installations Part 4 states that:
(4) The occupier of the building must ensure the repair is carried
out or the corrective action is taken no later than 1 month after
the maintenance of the installation was carried out, unless the
occupier has a reasonable excuse.
Examples of a reasonable excuse—
• No appropriately qualified person was available to attend the
occupier’s premises to carry out the repair or take the corrective
action because of the remoteness of the building’s location.
• The repair or corrective action was not able to be finished because
of the complexity of the work involved or delay in obtaining parts
required for the repair or corrective action.
Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply:
INCLUSIONS:
• Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays).
EXCLUSIONS:
• Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like.
• Work outside of Leading Fire Services normal working hours (as nominated above).
• Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step.
• Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames.
• Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered.
• Access to Energex locked rooms.
• If water isolation for repairs is not successful or we are asked to re-instate the water for any reason, additional costs will apply for a revisit.
NOTES & CONDITIONS:
• Leading Fire Services standard trading terms apply. A copy of our trading terms can be provided on request.
• Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing.
• Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote.
• Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates.
• This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required.
• The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client.
• Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs.
• In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test.
We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us. | Samin - 65 Nealdon Dr, Meadowbrook | Samin Sheet Metal Pty Ltd | — | 6 May 2026 | 6 June 2026 | 5 July 2026 |
| Actioned | Q-1084***Following a routine inspection, a number of defects were identified that require attention to maintain safety, performance, and overall condition. The below quotation outlines the recommended works to address these items and prevent further deterioration.***
The Building Fire Safety Regulation 2008, Part 5 Prescribed fire safety installations, Division 3 Obligations of occupiers, 54 Maintenance of prescribed fire safety installations Part 4 states that:
(4) The occupier of the building must ensure the repair is carried
out or the corrective action is taken no later than 1 month after
the maintenance of the installation was carried out, unless the
occupier has a reasonable excuse.
Examples of a reasonable excuse—
• No appropriately qualified person was available to attend the
occupier’s premises to carry out the repair or take the corrective
action because of the remoteness of the building’s location.
• The repair or corrective action was not able to be finished because
of the complexity of the work involved or delay in obtaining parts
required for the repair or corrective action.
Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply:
INCLUSIONS:
• Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays).
EXCLUSIONS:
• Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like.
• Work outside of Leading Fire Services normal working hours (as nominated above).
• Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step.
• Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames.
• Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered.
• Access to Energex locked rooms.
• If water isolation for repairs is not successful or we are asked to re-instate the water for any reason, additional costs will apply for a revisit.
NOTES & CONDITIONS:
• Leading Fire Services standard trading terms apply. A copy of our trading terms can be provided on request.
• Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing.
• Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote.
• Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates.
• This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required.
• The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client.
• Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs.
• In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test.
We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us. | Samin - 65 Nealdon Dr, Meadowbrook | Samin Sheet Metal Pty Ltd | — | 6 May 2026 | 6 June 2026 | 5 July 2026 |
| Actioned | Q-1081***This quotation is for information purposes only. Leading Fire Services are of the understanding that the works will be completed by another contractor and as such, a zero-dollar value has been applied to this quotation.*** | Brisbane Christian College | Brisbane Christian College Ltd | — | 5 May 2026 | 5 June 2026 | 4 July 2026 |
| Actioned | Q-1080***Following a routine inspection, a number of defects were identified that require attention to maintain safety, performance, and overall condition. The below quotation outlines the recommended works to address these items and prevent further deterioration.***
The Building Fire Safety Regulation 2008, Part 5 Prescribed fire safety installations, Division 3 Obligations of occupiers, 54 Maintenance of prescribed fire safety installations Part 4 states that:
(4) The occupier of the building must ensure the repair is carried
out or the corrective action is taken no later than 1 month after
the maintenance of the installation was carried out, unless the
occupier has a reasonable excuse.
Examples of a reasonable excuse—
• No appropriately qualified person was available to attend the
occupier’s premises to carry out the repair or take the corrective
action because of the remoteness of the building’s location.
• The repair or corrective action was not able to be finished because
of the complexity of the work involved or delay in obtaining parts
required for the repair or corrective action.
Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply:
INCLUSIONS:
• Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays).
EXCLUSIONS:
• Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like.
• Work outside of Leading Fire Services normal working hours (as nominated above).
• Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step.
• Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames.
• Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered.
• Access to Energex locked rooms.
• If water isolation for repairs is not successful or we are asked to re-instate the water for any reason, additional costs will apply for a revisit.
NOTES & CONDITIONS:
• Leading Fire Services standard trading terms apply. A copy of our trading terms can be provided on request.
• Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing.
• Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote.
• Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates.
• This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required.
• The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client.
• Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs.
• In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test.
We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us. | Brisbane Christian College | Brisbane Christian College Ltd | — | 5 May 2026 | 5 June 2026 | 4 July 2026 |
| Actioned | Q-1077***Following a routine inspection, a number of defects were identified that require attention to maintain safety, performance, and overall condition. The below quotation outlines the recommended works to address these items and prevent further deterioration.***
The Building Fire Safety Regulation 2008, Part 5 Prescribed fire safety installations, Division 3 Obligations of occupiers, 54 Maintenance of prescribed fire safety installations Part 4 states that:
(4) The occupier of the building must ensure the repair is carried
out or the corrective action is taken no later than 1 month after
the maintenance of the installation was carried out, unless the
occupier has a reasonable excuse.
Examples of a reasonable excuse—
• No appropriately qualified person was available to attend the
occupier’s premises to carry out the repair or take the corrective
action because of the remoteness of the building’s location.
• The repair or corrective action was not able to be finished because
of the complexity of the work involved or delay in obtaining parts
required for the repair or corrective action.
Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply:
INCLUSIONS:
• Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays).
EXCLUSIONS:
• Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like.
• Work outside of Leading Fire Services normal working hours (as nominated above).
• Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step.
• Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames.
• Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered.
• Access to Energex locked rooms.
• If water isolation for repairs is not successful or we are asked to re-instate the water for any reason, additional costs will apply for a revisit.
NOTES & CONDITIONS:
• Leading Fire Services standard trading terms apply. A copy of our trading terms can be provided on request.
• Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing.
• Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote.
• Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates.
• This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required.
• The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client.
• Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs.
• In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test.
We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us. | Brisbane Christian College | Brisbane Christian College Ltd | — | 25 Apr 2026 | 25 May 2026 | 24 June 2026 |