Defect Quotes

1,192 quotes

StatusRefPropertyClientSeverityRaisedDueExpires
ActionedQ-0042Leading Fire Services are pleased to submit for your consideration our proposal for the installation of 1 x new 2.5 KG A.B.E. Fire Extinguisher and required signage, to be located in the Reception Foyer.Oceania Public Accountants - Castle HillOceania Public Accountants—29 Sept 202313 Oct 202331 Oct 2023
VoidedQ-0041Attend site during business hours and after hours to carry out isolations and de-isolations for air conditioning upgrade works.National Archives AustraliaNational Archives Australia—25 Sept 202325 Oct 202325 Oct 2023
VoidedQ-0040Leading Fire Services are pleased to submit for your consideration our proposal for repairs identified during the recent inspection of the fire protection equipment. Supply and install Tank Level Indicators x 2 Mechanical Cat/Mouse type indicator to be used. Excludes. * Tank draining and Filling /Removal of sludge.(As required) * Tank foundations / concrete wall rectifications * Connection of the tank to live Water sources * Supply of internal Flanged Nozzles (By others) * Valves or controls * Inductions over one Hour * Inspection on site to see if any extra small works need to be completed * Water for hydrostatic testingSouthern Queensland Correctional CentreSouthern Queensland Correctional Centre—20 Sept 202320 Oct 202320 Oct 2023
ActionedQ-0039Replace 2 x 12 volt 35 A/H batteries Leading Fire Services are pleased to submit for your consideration our proposal for repairs identified during the recent inspection of the fire protection equipment. Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply: INCLUSIONS: • Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays). EXCLUSIONS: • Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like. • Work outside of Leading Fire Services normal working hours (as nominated above). • Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step. • Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames. • Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered. • Access to Energex locked rooms. • If water isolation for repairs is not successful, costs will apply for pipe freeze. NOTES & CONDITIONS: • The Fire and Rescue Service Act 1990 (FRSA), section 104D states that "The occupier of a building must maintain at all times every prescribed fire safety installation to a standard of safety and reliability in the event of fire”. • Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing. • Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote. • Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates. • This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required. • The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client. • Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs. • In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test. We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.Redeemer Lutheran CollegeRedeemer Lutheran College—19 Sept 202319 Oct 202319 Oct 2023
DeletedQ-0038Replace 2 x 12 volt 35 ah batteries Leading Fire Services are pleased to submit for your consideration our proposal for repairs identified during the recent inspection of the fire protection equipment.Redeemer Lutheran CollegeRedeemer Lutheran College—19 Sept 202319 Oct 202319 Oct 2023
VoidedQ-0037Carryout a 5 yearly hydrostatic pressure test *Excludes the boost and flow test.Southern Queensland Correctional CentreSouthern Queensland Correctional Centre—14 Sept 202314 Oct 202314 Oct 2023
ActionedQ-0036In response to a number of recent call-outs to site regarding the Wireless Detectors, we are proposing the following works; * Site attendance and replacement of 50 x battery sets in the wireless smoke and heat detectors on site. Also, identify and report those devices that cannot be accessed for further review. Please note that the existing wireless smoke and thermal detectors currently on site are superseded by newer variants and the new variant detectors do not communicate with the existing old wireless transmitters. If any of the existing detectors fail when the batteries are replaced, These will need to be replaced with the new variant models and programmed into the new wireless transmitters on site. Currently there are 2 x new wireless transmitters on site, installed under a separate job earlier in 2023. No allowance has been made in our quotation for the supply of any new smoke, thermal detectors and/or new wireless transmitters and programming works in this quotation. If this is found to be required, a separate quotation will be supplied to facilitate this.Public Services ClubDestination Brisbane Consortium—12 Sept 202329 Sept 202329 Sept 2023
VoidedQ-0035Leading Fire Services are pleased to submit for your consideration our proposal for repairs identified during the recent inspection of the fire protection equipment.Southern Queensland Correctional CentreSouthern Queensland Correctional Centre—11 Sept 202311 Oct 202311 Oct 2023
VoidedQ-0031The following defect items were identified whilst conducting the Annual Test on the Canteen Buildings Fire Detection and Evacuation systems. Leading Fire Services are pleased to submit for your consideration our proposal for repairs identified during the recent inspection of the fire protection equipment. Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply: INCLUSIONS: • Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays). EXCLUSIONS: • Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like. • Work outside of Leading Fire Services normal working hours (as nominated above). • Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step. • Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames. • Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered. • Access to Energex locked rooms. • If water isolation for repairs is not successful, costs will apply for pipe freeze. NOTES & CONDITIONS: • The Fire and Rescue Service Act 1990 (FRSA), section 104D states that "The occupier of a building must maintain at all times every prescribed fire safety installation to a standard of safety and reliability in the event of fire”. • Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing. • Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote. • Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates. • This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required. • The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client. • Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs. • In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test. We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.Progress Rail RedbankProgress Rail—1 Sept 202330 Nov 202330 Nov 2023
ActionedQ-0034Our quotation is for the repair of the existing Fire Hose Reels on site at Progress Rail. Leading Fire Services are pleased to submit for your consideration our proposal for repairs identified during the recent inspection of the fire protection equipment. Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply: INCLUSIONS: • Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays). EXCLUSIONS: • Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like. • Work outside of Leading Fire Services normal working hours (as nominated above). • Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step. • Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames. • Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered. • Access to Energex locked rooms. • If water isolation for repairs is not successful, costs will apply for pipe freeze. NOTES & CONDITIONS: • The Fire and Rescue Service Act 1990 (FRSA), section 104D states that "The occupier of a building must maintain at all times every prescribed fire safety installation to a standard of safety and reliability in the event of fire”. • Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing. • Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote. • Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates. • This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required. • The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client. • Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs. • In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test. We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.Progress Rail RedbankProgress Rail—1 Sept 202330 Nov 202330 Nov 2023
ActionedQ-0033The VESDA Aspirator Unit located in Residential Building R-12 which samples the Toilet Exhaust has failed and requires replacement. Our quotation is for the replacement of this failed unit only.Southern Queensland Correctional CentreSouthern Queensland Correctional Centre—1 Sept 20231 Oct 20231 Oct 2023
ActionedQ-0032As requested by Alan Niland, the Master Reset button on the E Control Evacuation System has failed due to usage. This front panel display unit and metalwork requires replacement to rectify.Southern Queensland Correctional CentreSouthern Queensland Correctional Centre—1 Sept 20231 Oct 20231 Oct 2023
VoidedQ-0030Leading Fire Services are pleased to submit for your consideration our proposal for repairs identified during the recent inspection of the fire protection equipment. Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply: INCLUSIONS: • Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays). EXCLUSIONS: • Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like. • Work outside of Leading Fire Services normal working hours (as nominated above). • Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step. • Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames. • Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered. • Access to Energex locked rooms. • If water isolation for repairs is not successful, costs will apply for pipe freeze. NOTES & CONDITIONS: • The Fire and Rescue Service Act 1990 (FRSA), section 104D states that "The occupier of a building must maintain at all times every prescribed fire safety installation to a standard of safety and reliability in the event of fire”. • Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing. • Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote. • Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates. • This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required. • The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client. • Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs. • In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test. We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.PCYC Fortitude ValleyQLD Police Citizens Youth Welfare Association—28 Aug 202330 June 202430 June 2024
VoidedQ-0029Supply and install a new Crossley display cardA Wood ShedFord Mountain P/L as Trustees to the Richard Ford Family Trust—18 Aug 202317 Sept 202317 Sept 2023
VoidedQ-0028Leading Fire Services are pleased to submit for your consideration our proposal for repairs identified during the recent inspection of the fire protection equipment.A Wood ShedFord Mountain P/L as Trustees to the Richard Ford Family Trust—16 Aug 202315 Sept 202315 Sept 2023
ActionedQ-0026Replace the existing fire tank level indicatorsCabanda CareCabanda Care—7 Aug 20236 Sept 20236 Sept 2023
ActionedQ-0027Leading Fire Services are pleased to submit for your consideration our proposal for repairs identified during the recent inspection of the fire protection equipment. - Supply and install a new Notifier CFP-16 conventional fire indicator panel complete with 60W O.W.S and 72hr battery back up to replace the obsolete and faulty Ampac AB800. - Supply and install 25 x conventional smoke detectors to replace the existing. - Supply and install 10 x conventional thermal detectors to replace the existing. - testing and commissioning. Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply: INCLUSIONS: • Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays). EXCLUSIONS: • Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like. • Work outside of Leading Fire Services normal working hours (as nominated above). • Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step. • Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames. • Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered. • Access to Energex locked rooms. • If water isolation for repairs is not successful, costs will apply for pipe freeze. NOTES & CONDITIONS: • The Fire and Rescue Service Act 1990 (FRSA), section 104D states that "The occupier of a building must maintain at all times every prescribed fire safety installation to a standard of safety and reliability in the event of fire”. • Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing. • Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote. • Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates. • This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required. • The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client. • Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs. • In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test. We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.PCYC GladstoneQLD Police Citizens Youth Welfare Association—7 Aug 20236 Sept 20236 Sept 2023
DeletedQ-0023Leading Fire Services are pleased to submit for your consideration our proposal for repairs identified during the recent inspection of the fire protection equipment. Our proposal is based on the repairs being performed during the next monthly routine inspection.Cabanda CareCabanda Care—4 Aug 20233 Sept 20233 Sept 2023
VoidedQ-0025Leading Fire Services are pleased to submit for your consideration our proposal for the upgrade of the non-compliant fire tanks identified during the recent inspection of the fire protection equipment. 1. Supply & Installation of if Galvanised Panel Tank with up to 25 Year Warranty 2. Design based on AWWA D103-1997, Engineering, Supply, Install & Testing of Galvanised Bolted Panel Tanks with 30 Years Design Life & 25 Year Warranty. 3. Non-trafficable colorbond roof with Manhole & Filler Box 4. Reinforced PVC Internal Liner with 15 Year Warranty - Waterproofed to all penetrations 5. Design and Engineering 6. Galvanised Wind Girders 7. Straight up internal ladder engineered to AS4020 8. External ladder & lockable cage engineered to AS4020 9. Galvanised Rooftop Landing Platform with Handrails 10. All Internal & External Fittings - Suction with Anti-Vortex, Overflow, Inlet and Drain 11. HDG Side Access Manway 750mm Diameter 12. Water Level Indicator 13. Delivery to site 14. Insurances, SWMS, ITP’s, Warranties, O&M Manual, Permits and Programs 15. 3 x Confined Space and Working at Heights Trained Technicians 16. Hire of Gas Detector and Emergency Extraction System 17. Form 15 & 16 - EngineeringCabanda CareCabanda Care—4 Aug 20233 Sept 20233 Sept 2023
ActionedQ-0024Leading Fire Services are pleased to submit for your consideration our proposal for repairs identified during the recent inspection of the fire protection equipment. Carry out the required repairs to the existing fire tanks.Cabanda CareCabanda Care—4 Aug 202327 Nov 202327 Nov 2023
ActionedQ-0022Attend site replace the Water damaged heat detector head and base located in the workshopBrisbane Manor HotelBrisbane Manor Hotel—2 Aug 20231 Sept 20231 Sept 2023
VoidedQ-0015During the recent fire door inspection, the following defects were identified for rectification.National Archives AustraliaNational Archives Australia—31 July 20236 Dec 20236 Dec 2023
ActionedQ-0016During the recent annual inspection, the following defects were identified for rectification.Southern Queensland Correctional CentreSouthern Queensland Correctional Centre—31 July 202330 Aug 202330 Aug 2023
VoidedQ-0021Attend site and diagnose / test the diesel engine and provide a report119 Macquarie Street119 Macquarie Street—31 July 202330 Aug 202330 Aug 2023
VoidedQ-0020Scope of Works. - Design of site wide hydrant system. - Design Drawings. - Form 15.Rockhampton RailRockhampton Rail—31 July 202330 Aug 202330 Aug 2023
ActionedQ-0019(v4)Round House No allowance has been made for the installation of new wiring should the existing be found to be faulty. We have not allowed for a high risk spotter for working at heights.Rockhampton RailRockhampton Rail—31 July 202330 Aug 202331 Oct 2023
ActionedQ-0019(v3)Building H No allowance has been made for the installation of new wiring should the existing be found to be faulty. We have not allowed for a high risk spotter for working at heights.Rockhampton RailRockhampton Rail—31 July 202330 Aug 202331 Oct 2023
VoidedQ-0019(v2)Building G and Amenities No allowance has been made for the installation of new wiring should the existing be found to be faulty. We have not allowed for a high risk spotter for working at heights.Rockhampton RailRockhampton Rail—31 July 202324 Jan 202424 Feb 2024
ActionedQ-0019Building C No allowance has been made for the installation of new wiring should the existing be found to be faulty. We have not allowed for a high risk spotter for working at heights.Rockhampton RailRockhampton Rail—31 July 202330 Aug 202331 Oct 2023
VoidedQ-0018During the recent investigation and repair of the damaged fire detection wiring, the following issues were identified for rectification. Leading Fire Services are pleased to submit for your consideration our proposal for repairs identified during the recent inspection of the fire protection equipment. Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply: INCLUSIONS: • Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays). EXCLUSIONS: • Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like. • Work outside of Leading Fire Services normal working hours (as nominated above). • Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step. • Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames. • Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered. • Access to Energex locked rooms. • If water isolation for repairs is not successful, costs will apply for pipe freeze. NOTES & CONDITIONS: • The Fire and Rescue Service Act 1990 (FRSA), section 104D states that "The occupier of a building must maintain at all times every prescribed fire safety installation to a standard of safety and reliability in the event of fire”. • Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing. • Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote. • Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates. • This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required. • The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client. • Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs. • In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test. We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.PCYC Capricorn CoastQLD Police Citizens Youth Welfare Association—31 July 202331 Jan 202431 Jan 2024
ActionedQ-0017During the recent inspection the following defects were identified for rectification.National Archives AustraliaNational Archives Australia—31 July 202330 Aug 202330 Aug 2023
ActionedQ-0014During the recent annual inspection, it was identified that the following VESDA units do not meet the installation requirements of the Project Services ASD installation specification. Our price is for the following. - Modify the existing 9 x VLF-250 toilet exhaust units in the residential blocks. - Modify the existing 1 x VLF-250 toilet exhaust unit in the Detention block. - Modify the existing 1 x VLF-250 toilet exhaust unit in the Medical block. - Replacement of blocked and damaged pipework as required. - Replacement of VLF-250 filters with new. - Programming and commissioning. Exclusions. - We have not allowed for the installation of the require access hatches in the duct work. - We have not allowed for supplying new VESDA VLF-250 should the existing units fail.Southern Queensland Correctional CentreSouthern Queensland Correctional Centre—30 July 202331 Aug 202431 Aug 2024
VoidedQ-0013During the recent 6 monthly inspection, the following items were identified for rectification.The MansionsDestination Brisbane Consortium—28 July 202327 Aug 202327 Aug 2023
ActionedQ-0012During the recent fire door inspection the following defects were identified for rectification.Marlborough CTS 12012Marlborough CTS 12012—27 July 202326 Aug 20231 Sept 2023
VoidedQ-00101. Supply & Install of 2 x Tank Capacity, 2 x Tank Purpose, 2 x Confined Space, 1 x Level Indicator Signage 2. Supply & Install of 2 x New Level Indicators to suit Tanks 3. Reinstate Site 4. Confined Space and Working at Heights Trained Technicians & Equipment 5. Rental of EWP & Scissor Lift 6. Insurances, SWMS, Program and PermitsSouthern Queensland Correctional CentreSouthern Queensland Correctional Centre—24 July 202323 Aug 202323 Aug 2023
ActionedQ-0011During the recent annual inspections, the following defects were identified for rectification.Southern Queensland Correctional CentreSouthern Queensland Correctional Centre—24 July 202323 Aug 202323 Aug 2023
VoidedQ-0009Mark up and supply a new AS1670.1 compliant A3 block plan for the fire indicator panel.idec Solutions Pty Ltdidec Solutions Pty Ltd—12 July 202311 Aug 202311 Aug 2023
ActionedQ-0008During the recent monthly inspection, the following defects were identified for rectification.idec Solutions Pty Ltdidec Solutions Pty Ltd—25 June 202325 July 202325 July 2023
DeletedQ-0007Replace and dispose of the following fire extinguisher as they are past their 5 yearly pressure test date in accordance with AS 1851 - 2012 5 x 2.5kg ABE 1 x 4.5kg ABEMarlborough CTS 12012Marlborough CTS 12012—21 June 202321 July 202321 July 2023
VoidedQ-0006Scope of Works: Disconnect and reconnect detectors and speakers as indicated on drawings for the Admin Building at Progress Rail. Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply: INCLUSIONS: • Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays). EXCLUSIONS: • Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like. • No allowance has been made for the supply and install of replacement speakers or detectors should the existing be unable to be reused. • Work outside of Leading Fire Services normal working hours (as nominated above). • Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step. • Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames. • Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered. • Access to Energex locked rooms. • If water isolation for repairs is not successful, costs will apply for pipe freeze. NOTES & CONDITIONS: • The Fire and Rescue Service Act 1990 (FRSA), section 104D states that "The occupier of a building must maintain at all times every prescribed fire safety installation to a standard of safety and reliability in the event of fire”. • Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing. • Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote. • Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates. • This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required. • The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client. • Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs. • In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test. We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.Progress Rail RedbankFormula Interiors Pty Ltd—18 June 202331 Jan 202431 Jan 2024
ActionedQ-0003During the recent audit of the fire extinguishers located at Petra Westkey, 74 - 76 Magnesium Drive, Crestmead, the following defects were identified for rectification.74 - 76 Magnesium DrivePrincess Mary Trust—14 June 202314 July 202331 July 2023
DeletedQ-0001Leading Fire Services Training PropertyLeading Fire Service Training Client—31 May 202330 June 202329 Aug 2023

1,151–1,192 of 1,192

PreviousPage 24 of 24Next