Defect Quotes

616 quotes

StatusRefPropertyClientSeverityRaisedDueExpires
ActionedQ-0032As requested by Alan Niland, the Master Reset button on the E Control Evacuation System has failed due to usage. This front panel display unit and metalwork requires replacement to rectify.Southern Queensland Correctional CentreSouthern Queensland Correctional Centre—1 Sept 20231 Oct 20231 Oct 2023
ActionedQ-0034Our quotation is for the repair of the existing Fire Hose Reels on site at Progress Rail. Leading Fire Services are pleased to submit for your consideration our proposal for repairs identified during the recent inspection of the fire protection equipment. Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply: INCLUSIONS: • Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays). EXCLUSIONS: • Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like. • Work outside of Leading Fire Services normal working hours (as nominated above). • Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step. • Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames. • Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered. • Access to Energex locked rooms. • If water isolation for repairs is not successful, costs will apply for pipe freeze. NOTES & CONDITIONS: • The Fire and Rescue Service Act 1990 (FRSA), section 104D states that "The occupier of a building must maintain at all times every prescribed fire safety installation to a standard of safety and reliability in the event of fire”. • Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing. • Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote. • Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates. • This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required. • The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client. • Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs. • In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test. We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.Progress Rail RedbankProgress Rail—1 Sept 202330 Nov 202330 Nov 2023
ActionedQ-0026Replace the existing fire tank level indicatorsCabanda CareCabanda Care—7 Aug 20236 Sept 20236 Sept 2023
ActionedQ-0027Leading Fire Services are pleased to submit for your consideration our proposal for repairs identified during the recent inspection of the fire protection equipment. - Supply and install a new Notifier CFP-16 conventional fire indicator panel complete with 60W O.W.S and 72hr battery back up to replace the obsolete and faulty Ampac AB800. - Supply and install 25 x conventional smoke detectors to replace the existing. - Supply and install 10 x conventional thermal detectors to replace the existing. - testing and commissioning. Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply: INCLUSIONS: • Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays). EXCLUSIONS: • Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like. • Work outside of Leading Fire Services normal working hours (as nominated above). • Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step. • Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames. • Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered. • Access to Energex locked rooms. • If water isolation for repairs is not successful, costs will apply for pipe freeze. NOTES & CONDITIONS: • The Fire and Rescue Service Act 1990 (FRSA), section 104D states that "The occupier of a building must maintain at all times every prescribed fire safety installation to a standard of safety and reliability in the event of fire”. • Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing. • Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote. • Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates. • This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required. • The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client. • Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs. • In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test. We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.PCYC GladstoneQLD Police Citizens Youth Welfare Association—7 Aug 20236 Sept 20236 Sept 2023
ActionedQ-0024Leading Fire Services are pleased to submit for your consideration our proposal for repairs identified during the recent inspection of the fire protection equipment. Carry out the required repairs to the existing fire tanks.Cabanda CareCabanda Care—4 Aug 202327 Nov 202327 Nov 2023
ActionedQ-0022Attend site replace the Water damaged heat detector head and base located in the workshopBrisbane Manor HotelBrisbane Manor Hotel—2 Aug 20231 Sept 20231 Sept 2023
ActionedQ-0017During the recent inspection the following defects were identified for rectification.National Archives AustraliaNational Archives Australia—31 July 202330 Aug 202330 Aug 2023
ActionedQ-0019(v4)Round House No allowance has been made for the installation of new wiring should the existing be found to be faulty. We have not allowed for a high risk spotter for working at heights.Rockhampton RailRockhampton Rail—31 July 202330 Aug 202331 Oct 2023
ActionedQ-0019(v3)Building H No allowance has been made for the installation of new wiring should the existing be found to be faulty. We have not allowed for a high risk spotter for working at heights.Rockhampton RailRockhampton Rail—31 July 202330 Aug 202331 Oct 2023
ActionedQ-0019Building C No allowance has been made for the installation of new wiring should the existing be found to be faulty. We have not allowed for a high risk spotter for working at heights.Rockhampton RailRockhampton Rail—31 July 202330 Aug 202331 Oct 2023
ActionedQ-0016During the recent annual inspection, the following defects were identified for rectification.Southern Queensland Correctional CentreSouthern Queensland Correctional Centre—31 July 202330 Aug 202330 Aug 2023
ActionedQ-0014During the recent annual inspection, it was identified that the following VESDA units do not meet the installation requirements of the Project Services ASD installation specification. Our price is for the following. - Modify the existing 9 x VLF-250 toilet exhaust units in the residential blocks. - Modify the existing 1 x VLF-250 toilet exhaust unit in the Detention block. - Modify the existing 1 x VLF-250 toilet exhaust unit in the Medical block. - Replacement of blocked and damaged pipework as required. - Replacement of VLF-250 filters with new. - Programming and commissioning. Exclusions. - We have not allowed for the installation of the require access hatches in the duct work. - We have not allowed for supplying new VESDA VLF-250 should the existing units fail.Southern Queensland Correctional CentreSouthern Queensland Correctional Centre—30 July 202331 Aug 202431 Aug 2024
ActionedQ-0012During the recent fire door inspection the following defects were identified for rectification.Marlborough CTS 12012Marlborough CTS 12012—27 July 202326 Aug 20231 Sept 2023
ActionedQ-0011During the recent annual inspections, the following defects were identified for rectification.Southern Queensland Correctional CentreSouthern Queensland Correctional Centre—24 July 202323 Aug 202323 Aug 2023
ActionedQ-0008During the recent monthly inspection, the following defects were identified for rectification.idec Solutions Pty Ltdidec Solutions Pty Ltd—25 June 202325 July 202325 July 2023
ActionedQ-0003During the recent audit of the fire extinguishers located at Petra Westkey, 74 - 76 Magnesium Drive, Crestmead, the following defects were identified for rectification.74 - 76 Magnesium DrivePrincess Mary Trust—14 June 202314 July 202331 July 2023

601–616 of 616

PreviousPage 13 of 13Next